Yeovil Pen Mill
YVPSouth WestManaged by Great Western Railway
How this station is performing
Yeovil Pen Mill had 10,065 scheduled stops to Period 7 of 2026-27, about 28 a day. 70.8% of recorded arrivals were within three minutes of the timetable and 4.7% of scheduled stops were cancelled.
Yeovil Pen Mill opened on 1 September 1856, 170 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Yeovil Pen Mill is the oldest; the next oldest, Yetminster, dates from 1857.
The nearest stations to Yeovil Pen Mill are Yeovil Junction (2.2 km south), Thornford (4.5 km south-east), Yetminster (6.1 km south-east), Sherborne (7.0 km east) and Chetnole (9.1 km south). 5 stations lie within 10 km in all. At 70.8%, Yeovil Pen Mill is more punctual than every one of them; the best of the five, Sherborne, manages 69.1%.
Yeovil Pen Mill is named after Yeovil, a market town, home to about 31,633 people, but the station stands 1.7 km from its centre.
2 operators call at Yeovil Pen Mill: Great Western Railway (66.1%, 64% of stops) and South Western Railway (79.4%, 36% of stops). The operator you travel with matters: South Western Railway reaches 79.4% within three minutes while Great Western Railway manages 66.1%, a gap of 13.3 percentage points.
2 of 3 stations of a similar size in South West are more punctual than Yeovil Pen Mill on 70.8%. The comparison group includes Okehampton (90.7%), Holton Heath (73.5%) and Ivybridge (67.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 6,393 | 66.1% | 3.2% |
| South Western Railway | 3,672 | 79.4% | 7.3% |
Operators with their own page for this station are linked to it.
Late train at Yeovil Pen Mill? Delay Repay
These operators call at Yeovil Pen Mill and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 738 | 74.2% | 3.3% |
| Period 6 of 2026-27 | 734 | 73.7% | 3.0% |
| Period 5 of 2026-27 | 796 | 63.0% | 4.6% |
| Period 4 of 2026-27 | 821 | 61.9% | 4.5% |
| Period 3 of 2026-27 | 774 | 69.8% | 7.5% |
| Period 2 of 2026-27 | 775 | 66.1% | 7.2% |
| Period 1 of 2026-27 | 879 | 75.0% | 3.0% |
| Period 13 of 2025-26 | 872 | 79.0% | 2.6% |
| Period 12 of 2025-26 | 791 | 79.7% | 2.7% |
| Period 11 of 2025-26 | 723 | 75.5% | 4.7% |
| Period 10 of 2025-26 | 645 | 76.1% | 6.4% |
| Period 9 of 2025-26 | 758 | 65.4% | 7.8% |
| Period 8 of 2025-26 | 759 | 60.0% | 4.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Okehampton | 10,058 | 90.7% | 3.4% |
| Holton Heath | 9,973 | 73.5% | 4.5% |
| Ivybridge | 10,183 | 67.8% | 4.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out