Greater Anglia had 5,293 scheduled stops at Whittlesea in the 13 periods to Period 7 of 2026-27, 67% of the station's total. 67.1% of recorded arrivals came within three minutes and 2.0% of stops were cancelled.
Greater Anglia trains at Whittlesea also serve Peterborough (9.4 km west, 75.3% on time, 2.0% cancelled), March (14.2 km east, 70.2% on time, 2.0% cancelled), Manea (20.8 km east, 67.3% on time, 2.0% cancelled), Ely (31.4 km south-east, 79.1% on time, 1.9% cancelled), Shippea Hill (38.3 km east, – on time, – cancelled) and Waterbeach (38.4 km south-east, 76.9% on time, 4.4% cancelled), which are the stations on its network closest to Whittlesea.
Within 30 km of here, Greater Anglia runs best at Peterborough, 9.4 km west (75.3%), and worst at Manea, 20.8 km east (67.3%).
The busiest Greater Anglia station within 30 km of Whittlesea is Peterborough, 9.4 km west, with about 15 scheduled stops a day.
Of the 2 operators with enough records at Whittlesea, Greater Anglia is the most punctual, at 67.1%.
Greater Anglia at Whittlesea has slipped sharply. 67.1% of stops came within three minutes of the timetable in the latest 13 periods, 9.8 percentage points worse than the 76.9% recorded in the 13 before. Cancellations held steady at 2.0% of scheduled stops, against 1.8% before.
Period by period
See how Greater Anglia Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 382 | 40.1% | 2.6% |
| Period 6 of 2026-27 | 432 | 30.1% | 4.6% |
| Period 5 of 2026-27 | 432 | 59.1% | 2.5% |
| Period 4 of 2026-27 | 420 | 75.6% | 2.4% |
| Period 3 of 2026-27 | 381 | 66.6% | 1.8% |
| Period 2 of 2026-27 | 348 | 78.2% | 2.3% |
| Period 1 of 2026-27 | 446 | 85.2% | 1.8% |
| Period 13 of 2025-26 | 466 | 84.8% | 0.9% |
| Period 12 of 2025-26 | 424 | 81.8% | 2.6% |
| Period 11 of 2025-26 | 424 | 78.8% | 0.9% |
| Period 10 of 2025-26 | 388 | 69.0% | 0.5% |
| Period 9 of 2025-26 | 414 | 59.4% | 1.4% |
| Period 8 of 2025-26 | 336 | 57.6% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Whittlesea
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 2,253 | 66.6% | 3.8% |
| East Midlands Railway | 302 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out