Whaley Bridge
WBREast MidlandsManaged by Northern Trains
How this station is performing
Whaley Bridge has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 16,568 scheduled stops, about 46 a day. In those periods 87.7% of stops arrived within three minutes of the timetable and 2.1% of scheduled stops were cancelled.
Whaley Bridge opened on 9 June 1857, 169 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Whaley Bridge is the oldest; the next oldest, Furness Vale, dates from 1857.
The nearest stations to Whaley Bridge are Furness Vale (2.1 km north), Chinley (2.9 km north-east), New Mills Newtown (3.6 km north-west), New Mills Central (4.1 km north) and Chapel-en-le-Frith (4.9 km south-east). 13 stations lie within 10 km in all. Of the five, Chapel-en-le-Frith is the most punctual at 88.2% and Chinley the least at 71.5%, with Whaley Bridge on 87.7%.
Whaley Bridge takes its name from a town called Whaley Bridge, home to about 6,455 people, and the station stands 0.1 km from its centre.
2 of 3 stations of a similar size in East Midlands are more punctual than Whaley Bridge on 87.7%. The comparison group includes Buxton (91.7%), Chapel-en-le-Frith (88.2%) and New Mills Newtown (87.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 16,568 | 87.7% | 2.1% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,213 | 86.2% | 1.2% |
| Period 6 of 2026-27 | 1,280 | 90.2% | 0.6% |
| Period 5 of 2026-27 | 1,274 | 85.9% | 2.1% |
| Period 4 of 2026-27 | 1,280 | 88.5% | 0.8% |
| Period 3 of 2026-27 | 1,224 | 86.8% | 2.0% |
| Period 2 of 2026-27 | 1,288 | 86.9% | 4.4% |
| Period 1 of 2026-27 | 1,482 | – | 4.9% |
| Period 13 of 2025-26 | 1,398 | 92.2% | 0.8% |
| Period 12 of 2025-26 | 1,171 | 94.1% | 0.5% |
| Period 11 of 2025-26 | 1,220 | 90.2% | 1.4% |
| Period 10 of 2025-26 | 1,170 | 86.3% | 4.3% |
| Period 9 of 2025-26 | 1,280 | 78.9% | 2.5% |
| Period 8 of 2025-26 | 1,288 | 85.6% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Buxton | 16,568 | 91.7% | 1.9% |
| Chapel-en-le-Frith | 16,568 | 88.2% | 2.1% |
| New Mills Newtown | 16,618 | 87.5% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out