Great Western Railway at West Ealing
All trains at West EalingGreat Western Railway across BritainLondon
How this operator is doing here
Great Western Railway had 20,209 scheduled stops at West Ealing in the 13 periods to Period 7 of 2026-27, 21% of the station's total. 96.0% of recorded arrivals came within three minutes and 4.3% of stops were cancelled.
Great Western Railway trains at West Ealing also serve Drayton Green (0.7 km north-west, 96.2% on time, 4.3% cancelled), Castle Bar Park (1.3 km north-west, 96.8% on time, 4.3% cancelled), Ealing Broadway (1.4 km east, 84.2% on time, 3.4% cancelled), South Greenford (2.5 km north-west, 97.3% on time, 4.3% cancelled), Greenford (3.6 km north-west, 96.8% on time, 4.3% cancelled) and Southall (4.0 km west, 82.5% on time, 3.6% cancelled), which are the stations on its network closest to West Ealing.
Within 30 km of here, Great Western Railway runs best at Windsor and Eton Central, 20.3 km west (99.0%), and worst at London Paddington, 9.9 km east (68.9%).
The busiest Great Western Railway station within 30 km of West Ealing is London Paddington, 9.9 km east, with about 363 scheduled stops a day.
Of the 2 operators with enough records at West Ealing, Great Western Railway is the most punctual, at 96.0%.
For Great Western Railway, West Ealing is the 8th best of 210 ranked stations. Its 96.0% here is 20.3 percentage points above the 75.7% across the whole network.
Period by period
See how Great Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,536 | 93.1% | 7.5% |
| Period 6 of 2026-27 | 1,536 | 87.7% | 5.1% |
| Period 5 of 2026-27 | 1,536 | 96.5% | 9.6% |
| Period 4 of 2026-27 | 1,536 | 95.6% | 4.3% |
| Period 3 of 2026-27 | 1,535 | 95.0% | 4.6% |
| Period 2 of 2026-27 | 1,536 | 94.6% | 3.9% |
| Period 1 of 2026-27 | 1,792 | 97.5% | 3.3% |
| Period 13 of 2025-26 | 1,664 | 98.1% | 1.1% |
| Period 12 of 2025-26 | 1,536 | 97.6% | 2.1% |
| Period 11 of 2025-26 | 1,536 | 97.7% | 4.6% |
| Period 10 of 2025-26 | 1,394 | 98.2% | 3.7% |
| Period 9 of 2025-26 | 1,536 | 98.4% | 4.5% |
| Period 8 of 2025-26 | 1,536 | 97.9% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at West Ealing
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Elizabeth line | 73,829 | 85.2% | 4.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out