Transport for Wales at Wellington (Shropshire)
All trains at Wellington (Shropshire)Transport for Wales across BritainWest Midlands
How this operator is doing here
Transport for Wales had 11,701 scheduled stops at Wellington (Shropshire) in the 13 periods to Period 7 of 2026-27, 35% of the station's total. 71.5% of recorded arrivals came within three minutes and 4.1% of stops were cancelled.
Transport for Wales trains at Wellington (Shropshire) also serve Oakengates (4.6 km east, – on time, – cancelled), Telford Central (5.6 km south-east, 69.3% on time, 4.1% cancelled), Shifnal (10.5 km east, – on time, – cancelled), Shrewsbury (15.7 km west, 73.6% on time, 2.3% cancelled), Cosford (15.9 km south-east, – on time, – cancelled) and Albrighton (18.1 km south-east, – on time, – cancelled), which are the stations on its network closest to Wellington (Shropshire).
Within 30 km of here, Transport for Wales runs best at Yorton, 19.0 km north-west (86.0%), and worst at Wolverhampton, 29.6 km south-east (66.3%).
The busiest Transport for Wales station within 30 km of Wellington (Shropshire) is Shrewsbury, 15.7 km west, with about 129 scheduled stops a day.
Of the 2 operators with enough records at Wellington (Shropshire), Transport for Wales is the least punctual, at 71.5%.
Over three full railway years Transport for Wales at Wellington (Shropshire) has improved each time, from 65.0% within three minutes in 2023-24 to 70.3% in 2024-25 and 73.0% in 2025-26.
Period by period
See how Transport for Wales Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 932 | 70.4% | 3.2% |
| Period 6 of 2026-27 | 934 | 64.6% | 3.3% |
| Period 5 of 2026-27 | 790 | 61.7% | 6.8% |
| Period 4 of 2026-27 | 727 | 68.2% | 5.4% |
| Period 3 of 2026-27 | 794 | 73.7% | 3.8% |
| Period 2 of 2026-27 | 906 | 67.9% | 11.9% |
| Period 1 of 2026-27 | 1,029 | 75.0% | 1.8% |
| Period 13 of 2025-26 | 1,027 | 81.7% | 2.5% |
| Period 12 of 2025-26 | 887 | 80.5% | 1.8% |
| Period 11 of 2025-26 | 907 | 79.6% | 6.4% |
| Period 10 of 2025-26 | 878 | 72.8% | 4.8% |
| Period 9 of 2025-26 | 947 | 63.3% | 1.3% |
| Period 8 of 2025-26 | 943 | 66.8% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Wellington (Shropshire)
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 22,118 | 78.8% | 3.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out