Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Wargrave

WGVSouth EastManaged by Great Western Railway

On time, last 13 periods98.0%Great Britain: 83.6%
Cancelled1.0%Great Britain: 3.2%
Stops a day66Scheduled, on average
Punctuality rankNot rankedAmong ranked stations

How this station is performing

Wargrave has usable figures for 4 of the last 13 four-week periods to Period 7 of 2026-27, covering 24,156 scheduled stops, about 66 a day. In those periods 98.0% of stops arrived within three minutes of the timetable and 1.0% of scheduled stops were cancelled.

Wargrave opened on 1 October 1900, 126 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Twyford is the oldest (1839) and Winnersh Triangle the newest (1986), with Wargrave in between.

The nearest stations to Wargrave are Shiplake (1.5 km north), Twyford (2.7 km south), Henley-on-Thames (4.3 km north), Winnersh Triangle (6.9 km south) and Earley (7.0 km south-west). 9 stations lie within 10 km in all. Of the five, Henley-on-Thames is the most punctual at 98.1% and Twyford the least at 85.3%, with Wargrave on 98.0%.

Wargrave is one of 2 stations named after a Village called Wargrave, home to about 3,935 people; this one stands 0.7 km from its centre.

Across the whole run of data, the weakest four-week period for Wargrave was Period 4 of 2025-26, at 93.4%, some time before the latest year. The strongest was Period 1 of 2026-27, at 99.0%, and the two are 5.6 percentage points apart.

Great Western Railway is the only operator serving Wargrave. Here it manages 98.0% within three minutes, 22.3 percentage points better than its 75.7% across its whole network.

Period by period

80%90%100%2023-242024-252025-262026-27Period 2 of 2023-24: 97.7%Period 4 of 2023-24: 95.8%Period 11 of 2024-25: 97.8%Period 4 of 2025-26: 93.4%Period 1 of 2026-27: 99.0%Period 3 of 2026-27: 98.9%Period 4 of 2026-27: 96.7%Period 6 of 2026-27: 97.6%
This pageGreat Britain
0%2%4%Period 1 of 2023-24: 0.6%Period 2 of 2023-24: 0.7%Period 3 of 2023-24: 1.2%Period 4 of 2023-24: 0.3%Period 5 of 2023-24: 1.0%Period 6 of 2023-24: 2.4%Period 7 of 2023-24: 0.6%Period 8 of 2023-24: 1.3%Period 9 of 2023-24: 1.8%Period 10 of 2023-24: 0.8%Period 11 of 2023-24: 1.0%Period 12 of 2023-24: 0.9%Period 13 of 2023-24: 1.1%Period 1 of 2024-25: 0.6%Period 2 of 2024-25: 0.5%Period 3 of 2024-25: 0.2%Period 4 of 2024-25: 1.7%Period 5 of 2024-25: 0.8%Period 6 of 2024-25: 0.5%Period 7 of 2024-25: 0.4%Period 8 of 2024-25: 0.3%Period 9 of 2024-25: 2.2%Period 10 of 2024-25: 2.4%Period 11 of 2024-25: 1.0%Period 12 of 2024-25: 0.8%Period 13 of 2024-25: 0.9%Period 1 of 2025-26: 0.8%Period 2 of 2025-26: 0.2%Period 3 of 2025-26: 0.9%Period 4 of 2025-26: 1.6%Period 5 of 2025-26: 0.3%Period 6 of 2025-26: 1.7%Period 7 of 2025-26: 1.2%Period 8 of 2025-26: 0.8%Period 9 of 2025-26: 1.4%Period 10 of 2025-26: 1.3%Period 11 of 2025-26: 1.3%Period 12 of 2025-26: 0.2%Period 13 of 2025-26: 0.4%Period 1 of 2026-27: 0.4%Period 2 of 2026-27: 0.8%Period 3 of 2026-27: 1.1%Period 4 of 2026-27: 0.9%Period 5 of 2026-27: 1.4%Period 6 of 2026-27: 2.2%Period 7 of 2026-27: 0.8%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Great Western Railway24,15698.0%1.0%

Operators with their own page for this station are linked to it.

Late train at Wargrave? Delay Repay

These operators call at Wargrave and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,840–0.8%
Period 6 of 2026-271,84097.6%2.2%
Period 5 of 2026-271,840–1.4%
Period 4 of 2026-271,79496.7%0.9%
Period 3 of 2026-271,84098.9%1.1%
Period 2 of 2026-271,840–0.8%
Period 1 of 2026-272,11199.0%0.4%
Period 13 of 2025-262,029–0.4%
Period 12 of 2025-261,840–0.2%
Period 11 of 2025-261,840–1.3%
Period 10 of 2025-261,662–1.3%
Period 9 of 2025-261,840–1.4%
Period 8 of 2025-261,840–0.8%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out