TransPennine Express at Urmston
All trains at UrmstonTransPennine Express across BritainNorth West
How this operator is doing here
TransPennine Express had 8,327 scheduled stops at Urmston in the 13 periods to Period 7 of 2026-27, 35% of the station's total. 54.1% of recorded arrivals came within three minutes and 7.4% of stops were cancelled.
TransPennine Express trains at Urmston also serve Irlam (5.5 km west, 53.8% on time, 7.2% cancelled), Salford Crescent (6.7 km north-east, – on time, – cancelled), Deansgate (7.4 km north-east, – on time, – cancelled), Manchester Oxford Road (7.9 km east, 53.6% on time, 3.9% cancelled), Manchester Victoria (8.6 km north-east, 69.2% on time, 2.8% cancelled) and Manchester Piccadilly (8.8 km east, 65.8% on time, 3.5% cancelled), which are the stations on its network closest to Urmston.
Within 30 km of here, TransPennine Express runs best at Manchester Airport, 10.7 km south-east (77.8%), and worst at Manchester Oxford Road, 7.9 km east (53.6%).
The busiest TransPennine Express station within 30 km of Urmston is Manchester Piccadilly, 8.8 km east, with about 152 scheduled stops a day.
TransPennine Express at Urmston has slipped sharply. 54.1% of stops came within three minutes of the timetable in the latest 13 periods, 8.0 percentage points worse than the 62.1% recorded in the 13 before. Cancellations rose to 7.4% of scheduled stops from 5.9%, which is 1.5 percentage points more.
Period by period
See how TransPennine Express Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 628 | 56.3% | 5.1% |
| Period 6 of 2026-27 | 637 | 53.9% | 6.6% |
| Period 5 of 2026-27 | 636 | 48.8% | 11.0% |
| Period 4 of 2026-27 | 634 | 56.6% | 10.9% |
| Period 3 of 2026-27 | 640 | 48.3% | 6.1% |
| Period 2 of 2026-27 | 640 | 58.8% | 10.0% |
| Period 1 of 2026-27 | 734 | 59.0% | 7.1% |
| Period 13 of 2025-26 | 698 | 61.2% | 4.4% |
| Period 12 of 2025-26 | 644 | 59.9% | 4.7% |
| Period 11 of 2025-26 | 603 | 56.8% | 4.5% |
| Period 10 of 2025-26 | 568 | 47.4% | 10.6% |
| Period 9 of 2025-26 | 634 | 41.8% | 7.4% |
| Period 8 of 2025-26 | 631 | 52.3% | 8.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Urmston
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 15,801 | 65.0% | 3.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out