Upholland
UPLNorth WestManaged by Northern Trains
How this station is performing
Upholland has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 8,740 scheduled stops, about 24 a day. In those periods 87.4% of stops arrived within three minutes of the timetable and 3.2% of scheduled stops were cancelled.
Upholland opened on 20 November 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Upholland is the oldest; the next oldest, Orrell, dates from 1848.
The nearest stations to Upholland are Orrell (2.2 km east), Rainford (3.4 km west), Gathurst (4.7 km north-east), Pemberton (4.7 km east) and Appley Bridge (5.8 km north). 13 stations lie within 10 km in all. At 87.4%, Upholland is more punctual than every one of them; the best of the five, Rainford, manages 86.9%.
Across the whole run of data, the weakest four-week period for Upholland was Period 9 of 2023-24, at 68.7%, some time before the latest year. The strongest was Period 13 of 2024-25, at 94.3%, and the two are 25.6 percentage points apart. Cancellations peaked at 9.7% of scheduled stops in Period 10 of 2024-25, against 3.2% over the latest 13 periods.
Compared with 3 stations of a similar size in North West, Upholland is the most punctual, at 87.4%. The comparison group includes Orrell (86.9%), Pemberton (82.2%) and Rainford (86.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 8,740 | 87.4% | 3.2% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 672 | 79.2% | 2.5% |
| Period 6 of 2026-27 | 672 | 91.4% | 2.4% |
| Period 5 of 2026-27 | 672 | 91.0% | 2.7% |
| Period 4 of 2026-27 | 672 | 88.2% | 4.5% |
| Period 3 of 2026-27 | 569 | 92.8% | 2.5% |
| Period 2 of 2026-27 | 672 | 84.5% | 4.2% |
| Period 1 of 2026-27 | 784 | – | 1.3% |
| Period 13 of 2025-26 | 728 | 92.4% | 1.4% |
| Period 12 of 2025-26 | 672 | 87.3% | 1.2% |
| Period 11 of 2025-26 | 672 | 89.0% | 3.9% |
| Period 10 of 2025-26 | 616 | 89.2% | 5.0% |
| Period 9 of 2025-26 | 667 | 80.0% | 4.6% |
| Period 8 of 2025-26 | 672 | 83.8% | 5.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out