Trimley
TRMEast of EnglandManaged by Greater Anglia
How this station is performing
Trimley had 12,386 scheduled stops to Period 7 of 2026-27, about 34 a day. 93.4% of recorded arrivals were within three minutes of the timetable and 1.5% of scheduled stops were cancelled.
Trimley opened on 1 May 1891, 135 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Harwich Town is the oldest (1854) and Felixstowe the newest (1898), with Trimley in between.
The nearest stations to Trimley are Felixstowe (2.3 km south-east), Harwich Town (4.3 km south-west), Dovercourt (5.0 km south-west), Harwich International (5.4 km south-west) and Wrabness (10.9 km west). 4 stations lie within 10 km in all. Of the five, Felixstowe is the most punctual at 96.0% and Wrabness the least at 91.9%, with Trimley on 93.4%.
Across the whole run of data, the weakest four-week period for Trimley was Period 7 of 2025-26, at 84.3%, some time before the latest year. The strongest was Period 2 of 2026-27, at 96.8%, and the two are 12.5 percentage points apart.
Compared with 3 stations of a similar size in East of England, Trimley is the least punctual, at 93.4%. All of them are ahead, including Derby Road (Ipswich) (94.2%), Felixstowe (96.0%) and Sheringham (96.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 12,386 | 93.4% | 1.5% |
Operators with their own page for this station are linked to it.
Late train at Trimley? Delay Repay
These operators call at Trimley and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 922 | 94.9% | 0.4% |
| Period 6 of 2026-27 | 922 | 93.9% | 2.8% |
| Period 5 of 2026-27 | 944 | 93.6% | 0.4% |
| Period 4 of 2026-27 | 944 | 89.8% | 4.6% |
| Period 3 of 2026-27 | 944 | 92.6% | 3.2% |
| Period 2 of 2026-27 | 944 | 96.8% | 0.7% |
| Period 1 of 2026-27 | 1,086 | 94.7% | 0.9% |
| Period 13 of 2025-26 | 1,038 | 94.4% | 2.0% |
| Period 12 of 2025-26 | 944 | 93.1% | 1.3% |
| Period 11 of 2025-26 | 944 | 95.0% | 0.0% |
| Period 10 of 2025-26 | 866 | 94.1% | 0.5% |
| Period 9 of 2025-26 | 944 | 90.0% | 1.7% |
| Period 8 of 2025-26 | 944 | 90.4% | 0.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Derby Road (Ipswich) | 12,386 | 94.2% | 1.4% |
| Felixstowe | 12,386 | 96.0% | 1.5% |
| Sheringham | 12,438 | 96.6% | 0.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out