Great Western Railway at Tackley
All trains at TackleyGreat Western Railway across BritainSouth East
How this operator is doing here
Great Western Railway had 6,010 scheduled stops at Tackley in the 13 periods to Period 7 of 2026-27, 96% of the station's total. 75.8% of recorded arrivals came within three minutes and 2.2% of stops were cancelled.
Great Western Railway trains at Tackley also serve Heyford (4.2 km north, 75.5% on time, 2.2% cancelled), Hanborough (8.1 km south-west, 60.5% on time, 4.5% cancelled), Combe (Oxon) (8.6 km south-west, – on time, – cancelled), Finstock (12.3 km west, – on time, – cancelled), Charlbury (13.3 km west, 60.9% on time, 4.4% cancelled) and Oxford (14.3 km south, 72.1% on time, 4.6% cancelled), which are the stations on its network closest to Tackley.
Within 30 km of here, Great Western Railway runs best at Kings Sutton, 15.6 km north (76.5%), and worst at Kingham, 22.9 km west (56.7%).
The busiest Great Western Railway station within 30 km of Tackley is Oxford, 14.3 km south, with about 125 scheduled stops a day.
Great Western Railway at Tackley has slipped a little, from 80.4% within three minutes in the previous 13 periods to 75.8% in the latest 13, a fall of 4.6 percentage points. Cancellations held steady at 2.2% of scheduled stops, against 2.4% before.
Period by period
See how Great Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 276 | 66.7% | 3.3% |
| Period 6 of 2026-27 | 288 | 65.5% | 1.4% |
| Period 5 of 2026-27 | 284 | 60.8% | 3.9% |
| Period 4 of 2026-27 | 283 | 60.0% | 1.1% |
| Period 3 of 2026-27 | 411 | 72.6% | 5.8% |
| Period 2 of 2026-27 | 556 | 74.6% | 1.6% |
| Period 1 of 2026-27 | 642 | 79.7% | 2.0% |
| Period 13 of 2025-26 | 600 | 85.8% | 1.5% |
| Period 12 of 2025-26 | 544 | 80.6% | 4.4% |
| Period 11 of 2025-26 | 552 | 82.7% | 1.8% |
| Period 10 of 2025-26 | 488 | 83.3% | 0.8% |
| Period 9 of 2025-26 | 552 | 72.2% | 1.1% |
| Period 8 of 2025-26 | 534 | 74.5% | 1.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Tackley
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chiltern Railways | 221 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out