Northern at St Helens Central
All trains at St Helens CentralNorthern across BritainNorth West
How this operator is doing here
Northern had 32,694 scheduled stops at St Helens Central in the 13 periods to Period 7 of 2026-27, 92% of the station's total. 88.1% of recorded arrivals came within three minutes and 2.5% of stops were cancelled.
Northern trains at St Helens Central also serve Thatto Heath (2.6 km south-west, 90.7% on time, 2.5% cancelled), Lea Green (2.9 km south, 67.6% on time, 3.1% cancelled), St Helens Junction (2.9 km south-east, 68.4% on time, 3.0% cancelled), Eccleston Park (4.1 km south-west, 90.6% on time, 2.5% cancelled), Rainhill (4.6 km south-west, 70.5% on time, 3.1% cancelled) and Garswood (5.5 km north-east, 89.6% on time, 2.4% cancelled), which are the stations on its network closest to St Helens Central.
Within 30 km of here, Northern runs best at Thatto Heath, 2.6 km south-west (90.7%), and worst at Moses Gate, 24.6 km north-east (52.6%).
The busiest Northern station within 30 km of St Helens Central is Bolton, 24.2 km north-east, with about 209 scheduled stops a day.
Of the 2 operators with enough records at St Helens Central, Northern is the most punctual, at 88.1%.
For Northern, St Helens Central is the 57th best of 493 ranked stations. Its 88.1% here is 9.5 percentage points above the 78.6% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,512 | 90.0% | 1.6% |
| Period 6 of 2026-27 | 2,503 | 90.9% | 1.2% |
| Period 5 of 2026-27 | 2,504 | 88.9% | 4.4% |
| Period 4 of 2026-27 | 2,513 | 89.0% | 1.2% |
| Period 3 of 2026-27 | 2,338 | 88.8% | 1.7% |
| Period 2 of 2026-27 | 2,474 | 89.9% | 2.3% |
| Period 1 of 2026-27 | 2,918 | 92.4% | 1.2% |
| Period 13 of 2025-26 | 2,731 | 88.9% | 4.0% |
| Period 12 of 2025-26 | 2,511 | 89.8% | 1.4% |
| Period 11 of 2025-26 | 2,508 | 90.2% | 1.4% |
| Period 10 of 2025-26 | 2,189 | 80.6% | 6.6% |
| Period 9 of 2025-26 | 2,489 | 78.9% | 3.5% |
| Period 8 of 2025-26 | 2,504 | 85.2% | 2.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at St Helens Central
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 2,753 | 85.0% | 8.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out