St Columb Road
SCRSouth WestManaged by Great Western Railway
How this station is performing
St Columb Road has usable figures for 6 of the last 13 four-week periods to Period 7 of 2026-27, covering 5,358 scheduled stops, about 15 a day. In those periods 76.8% of stops arrived within three minutes of the timetable and 9.1% of scheduled stops were cancelled.
St Columb Road opened on 20 June 1876, 150 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, St Austell is the oldest (1859) and Quintrell Downs the newest (1911), with St Columb Road in between.
The nearest stations to St Columb Road are Quintrell Downs (6.3 km west), Roche (8.1 km east), Newquay (9.7 km west), Bugle (10.6 km east) and St Austell (12.6 km south-east). 3 stations lie within 10 km in all. Of the five, Newquay is the most punctual at 85.3% and St Austell the least at 66.6%, with St Columb Road on 76.8%.
St Columb Road takes its name from a Village called St Columb Road, and the station stands 0.3 km from its centre.
For St Columb Road, the weakest four-week period in the data is a recent one: Period 5 of 2026-27, when only 67.9% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2024-25, at 91.1%, which is 23.2 percentage points higher. Cancellations peaked at 27.5% of scheduled stops in Period 11 of 2025-26, against 9.1% over the latest 13 periods.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 5,358 | 76.8% | 9.1% |
Operators with their own page for this station are linked to it.
Late train at St Columb Road? Delay Repay
These operators call at St Columb Road and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 464 | 87.6% | 6.3% |
| Period 6 of 2026-27 | 479 | 80.8% | 5.2% |
| Period 5 of 2026-27 | 488 | 67.9% | 13.7% |
| Period 4 of 2026-27 | 480 | 68.0% | 17.9% |
| Period 3 of 2026-27 | 451 | – | 12.0% |
| Period 2 of 2026-27 | 444 | – | 6.1% |
| Period 1 of 2026-27 | 472 | 78.3% | 1.5% |
| Period 13 of 2025-26 | 446 | – | 1.3% |
| Period 12 of 2025-26 | 408 | – | 7.4% |
| Period 11 of 2025-26 | 269 | – | 27.5% |
| Period 10 of 2025-26 | 362 | – | 17.7% |
| Period 9 of 2025-26 | 283 | – | 3.9% |
| Period 8 of 2025-26 | 312 | 78.5% | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out