St Budeaux Ferry Road
SBFSouth WestManaged by Great Western Railway
How this station is performing
St Budeaux Ferry Road had 4,038 scheduled stops to Period 7 of 2026-27, about 11 a day. 76.5% of recorded arrivals were within three minutes of the timetable and 6.8% of scheduled stops were cancelled.
St Budeaux Ferry Road opened on 1 June 1904, 122 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Saltash is the oldest (1859) and Dockyard (Devonport) the newest (1905), with St Budeaux Ferry Road in between.
The nearest stations to St Budeaux Ferry Road are St Budeaux Victoria Road (0.1 km north-west), Keyham (1.3 km south), Saltash (1.7 km west), Dockyard (Devonport) (2.2 km south) and Devonport (2.8 km south-east). 9 stations lie within 10 km in all. Of the five, St Budeaux Victoria Road is the most punctual at 83.5% and Saltash the least at 70.5%, with St Budeaux Ferry Road on 76.5%.
St Budeaux Ferry Road is named after St Budeaux, a suburb, home to about 13,369 people, but the station stands 0.2 km from its centre.
Compared with 3 stations of a similar size in South West, St Budeaux Ferry Road is the most punctual, at 76.5%. The comparison group includes Lapford (56.3%), Bugle (70.9%) and Roche (73.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 4,038 | 76.5% | 6.8% |
Operators with their own page for this station are linked to it.
Late train at St Budeaux Ferry Road? Delay Repay
These operators call at St Budeaux Ferry Road and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 287 | 75.5% | 1.0% |
| Period 6 of 2026-27 | 300 | 76.2% | 10.7% |
| Period 5 of 2026-27 | 311 | 70.2% | 16.4% |
| Period 4 of 2026-27 | 312 | 75.6% | 12.8% |
| Period 3 of 2026-27 | 312 | 76.9% | 14.1% |
| Period 2 of 2026-27 | 308 | 79.4% | 5.5% |
| Period 1 of 2026-27 | 356 | 84.7% | 2.8% |
| Period 13 of 2025-26 | 342 | 83.5% | 3.5% |
| Period 12 of 2025-26 | 312 | 88.3% | 2.9% |
| Period 11 of 2025-26 | 311 | 67.6% | 8.4% |
| Period 10 of 2025-26 | 272 | 66.7% | 3.3% |
| Period 9 of 2025-26 | 303 | 68.8% | 4.6% |
| Period 8 of 2025-26 | 312 | 76.2% | 2.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out