St Andrews Road
SARSouth WestManaged by Great Western Railway
How this station is performing
St Andrews Road has usable figures for 8 of the last 13 four-week periods to Period 7 of 2026-27, covering 14,532 scheduled stops, about 40 a day. In those periods 78.6% of stops arrived within three minutes of the timetable and 4.0% of scheduled stops were cancelled.
St Andrews Road opened on 30 June 1924, 102 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Shirehampton is the oldest (1865) and Portway Park and Ride the newest (2023), with St Andrews Road in between.
The nearest stations to St Andrews Road are Avonmouth (1.4 km south), Portway Park and Ride (2.8 km south), Shirehampton (3.4 km south), Sea Mills (4.9 km south-east) and Severn Beach (5.7 km north-east). 14 stations lie within 10 km in all. Of the five, Severn Beach is the most punctual at 79.1% and Portway Park and Ride the least at 68.7%, with St Andrews Road on 78.6%.
For St Andrews Road, the weakest four-week period in the data is a recent one: Period 7 of 2026-27, when only 73.8% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2026-27, at 83.4%, which is 9.6 percentage points higher. Cancellations peaked at 13.5% of scheduled stops in Period 9 of 2024-25, against 4.0% over the latest 13 periods.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 14,532 | 78.6% | 4.0% |
Operators with their own page for this station are linked to it.
Late train at St Andrews Road? Delay Repay
These operators call at St Andrews Road and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,144 | 73.8% | 3.0% |
| Period 6 of 2026-27 | 944 | 78.0% | 4.6% |
| Period 5 of 2026-27 | 870 | 77.0% | 6.7% |
| Period 4 of 2026-27 | 1,144 | 75.7% | 9.2% |
| Period 3 of 2026-27 | 1,114 | 81.1% | 8.3% |
| Period 2 of 2026-27 | 1,144 | 77.7% | 5.0% |
| Period 1 of 2026-27 | 1,318 | 83.4% | 0.8% |
| Period 13 of 2025-26 | 1,240 | 82.6% | 1.5% |
| Period 12 of 2025-26 | 1,144 | – | 1.9% |
| Period 11 of 2025-26 | 1,144 | – | 1.7% |
| Period 10 of 2025-26 | 1,038 | – | 6.4% |
| Period 9 of 2025-26 | 1,144 | – | 3.2% |
| Period 8 of 2025-26 | 1,144 | – | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out