East Midlands Railway had 11,889 scheduled stops at Spondon in the 13 periods to Period 7 of 2026-27, 83% of the station's total. 80.2% of recorded arrivals came within three minutes and 1.8% of stops were cancelled.
East Midlands Railway trains at Spondon also serve Derby (3.5 km west, 72.2% on time, 2.8% cancelled), Peartree (4.4 km west, 74.3% on time, 2.9% cancelled), Long Eaton (8.8 km east, 71.1% on time, 2.7% cancelled), Duffield (9.8 km north-west, 82.9% on time, 1.9% cancelled), Ilkeston (10.8 km north-east, 66.6% on time, 3.5% cancelled) and East Midlands Parkway (11.4 km south-east, 65.7% on time, 4.7% cancelled), which are the stations on its network closest to Spondon.
Within 30 km of here, East Midlands Railway runs best at Newstead, 21.6 km north-east (88.2%), and worst at Alfreton, 21.2 km north (63.1%).
The busiest East Midlands Railway station within 30 km of Spondon is Nottingham, 18.2 km east, with about 276 scheduled stops a day.
East Midlands Railway at Spondon improved sharply over the past year. In the latest 13 periods 80.2% of stops came within three minutes of the timetable, up 6.9 percentage points from 73.3% in the 13 before. Cancellations held steady at 1.8% of scheduled stops, against 1.6% before.
Period by period
See how East Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 972 | 82.2% | 1.3% |
| Period 6 of 2026-27 | 967 | 80.1% | 1.8% |
| Period 5 of 2026-27 | 968 | 79.2% | 2.2% |
| Period 4 of 2026-27 | 972 | 79.6% | 2.1% |
| Period 3 of 2026-27 | 964 | 77.8% | 2.4% |
| Period 2 of 2026-27 | 968 | 80.1% | 2.2% |
| Period 1 of 2026-27 | 1,117 | 83.1% | 1.2% |
| Period 13 of 2025-26 | 1,056 | 80.9% | 2.3% |
| Period 12 of 2025-26 | 965 | 81.6% | 1.3% |
| Period 11 of 2025-26 | 964 | 87.5% | 1.3% |
| Period 10 of 2025-26 | 796 | 83.1% | 2.5% |
| Period 9 of 2025-26 | 588 | 67.7% | 1.5% |
| Period 8 of 2025-26 | 592 | 71.5% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Spondon
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 2,357 | 83.7% | 5.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out