East Midlands Railway at Spalding
All trains at SpaldingEast Midlands Railway across BritainEast Midlands
How this operator is doing here
East Midlands Railway had 9,153 scheduled stops at Spalding in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 84.3% of recorded arrivals came within three minutes and 2.1% of stops were cancelled.
East Midlands Railway trains at Spalding also serve Swineshead (20.2 km north, – on time, 2.3% cancelled), Hubberts Bridge (21.0 km north, – on time, 2.4% cancelled), Boston (22.7 km north, 72.2% on time, 2.4% cancelled), Heckington (22.9 km north-west, – on time, 2.0% cancelled), Peterborough (24.6 km south, 70.5% on time, 3.0% cancelled) and Whittlesea (26.7 km south, – on time, – cancelled), which are the stations on its network closest to Spalding.
Within 30 km of here, East Midlands Railway runs best at Sleaford, 28.6 km north-west (78.2%), and worst at Peterborough, 24.6 km south (70.5%).
The busiest East Midlands Railway station within 30 km of Spalding is Sleaford, 28.6 km north-west, with about 56 scheduled stops a day.
Of the 1 operators with enough records at Spalding, East Midlands Railway is the most punctual, at 84.3%.
Over three full railway years East Midlands Railway at Spalding has improved each time, from 83.6% within three minutes in 2023-24 to 85.8% in 2024-25 and 88.7% in 2025-26.
Period by period
See how East Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 706 | 75.2% | 0.4% |
| Period 6 of 2026-27 | 708 | 61.3% | 0.8% |
| Period 5 of 2026-27 | 716 | 78.7% | 2.9% |
| Period 4 of 2026-27 | 706 | 84.9% | 3.3% |
| Period 3 of 2026-27 | 697 | 84.8% | 3.0% |
| Period 2 of 2026-27 | 716 | 88.9% | 4.2% |
| Period 1 of 2026-27 | 827 | 89.9% | 1.7% |
| Period 13 of 2025-26 | 768 | 91.5% | 2.9% |
| Period 12 of 2025-26 | 708 | 91.9% | 0.4% |
| Period 11 of 2025-26 | 697 | 89.6% | 0.7% |
| Period 10 of 2025-26 | 624 | 91.1% | 1.0% |
| Period 9 of 2025-26 | 644 | 84.5% | 4.8% |
| Period 8 of 2025-26 | 636 | 83.1% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out