Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

South Greenford

SGNLondonManaged by Great Western Railway

On time, last 13 periods97.3%Great Britain: 83.6%
Cancelled4.3%Great Britain: 3.2%
Stops a day56Scheduled, on average
Punctuality rankNot rankedAmong ranked stations

How this station is performing

South Greenford has usable figures for 3 of the last 13 four-week periods to Period 7 of 2026-27, covering 20,207 scheduled stops, about 56 a day. In those periods 97.3% of stops arrived within three minutes of the timetable and 4.3% of scheduled stops were cancelled.

South Greenford opened on 20 September 1926, 100 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, South Greenford is the newest; the oldest, Hanwell, opened in 1838.

The nearest stations to South Greenford are Greenford (1.1 km north-west), Castle Bar Park (1.2 km south), Drayton Green (1.9 km south), Hanwell (2.4 km south) and West Ealing (2.5 km south-east). 55 stations lie within 10 km in all. At 97.3%, South Greenford is more punctual than every one of them; the best of the five, Castle Bar Park, manages 96.8%.

Across the whole run of data, the weakest four-week period for South Greenford was Period 2 of 2023-24, at 95.0%, some time before the latest year. The strongest was Period 1 of 2026-27, at 98.8%, and the two are 3.8 percentage points apart. Cancellations peaked at 9.6% of scheduled stops in Period 5 of 2026-27, against 4.3% over the latest 13 periods.

Great Western Railway is the only operator serving South Greenford. Here it manages 97.3% within three minutes, 21.6 percentage points better than its 75.7% across its whole network.

Period by period

80%90%100%2023-242024-252025-262026-27Period 2 of 2023-24: 95.0%Period 2 of 2025-26: 98.3%Period 3 of 2025-26: 97.9%Period 10 of 2025-26: 98.5%Period 1 of 2026-27: 98.8%Period 7 of 2026-27: 95.3%
This pageGreat Britain
0%5%10%Period 1 of 2023-24: 2.1%Period 2 of 2023-24: 2.5%Period 3 of 2023-24: 1.4%Period 4 of 2023-24: 3.4%Period 5 of 2023-24: 5.0%Period 6 of 2023-24: 3.7%Period 7 of 2023-24: 1.0%Period 8 of 2023-24: 1.6%Period 9 of 2023-24: 3.5%Period 10 of 2023-24: 2.3%Period 11 of 2023-24: 2.2%Period 12 of 2023-24: 0.9%Period 13 of 2023-24: 1.4%Period 1 of 2024-25: 2.2%Period 2 of 2024-25: 2.8%Period 3 of 2024-25: 1.1%Period 4 of 2024-25: 1.3%Period 5 of 2024-25: 2.1%Period 6 of 2024-25: 1.8%Period 7 of 2024-25: 0.9%Period 8 of 2024-25: 2.8%Period 9 of 2024-25: 3.6%Period 10 of 2024-25: 1.8%Period 11 of 2024-25: 1.3%Period 12 of 2024-25: 1.6%Period 13 of 2024-25: 2.8%Period 1 of 2025-26: 3.1%Period 2 of 2025-26: 2.3%Period 3 of 2025-26: 1.6%Period 4 of 2025-26: 3.3%Period 5 of 2025-26: 0.5%Period 6 of 2025-26: 3.5%Period 7 of 2025-26: 2.5%Period 8 of 2025-26: 2.1%Period 9 of 2025-26: 4.6%Period 10 of 2025-26: 3.7%Period 11 of 2025-26: 4.6%Period 12 of 2025-26: 2.1%Period 13 of 2025-26: 1.1%Period 1 of 2026-27: 3.4%Period 2 of 2026-27: 3.9%Period 3 of 2026-27: 4.6%Period 4 of 2026-27: 4.2%Period 5 of 2026-27: 9.6%Period 6 of 2026-27: 5.1%Period 7 of 2026-27: 7.5%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Great Western Railway20,20797.3%4.3%

Operators with their own page for this station are linked to it.

Late train at South Greenford? Delay Repay

These operators call at South Greenford and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,53695.3%7.5%
Period 6 of 2026-271,536–5.1%
Period 5 of 2026-271,534–9.6%
Period 4 of 2026-271,536–4.2%
Period 3 of 2026-271,535–4.6%
Period 2 of 2026-271,536–3.9%
Period 1 of 2026-271,79298.8%3.4%
Period 13 of 2025-261,664–1.1%
Period 12 of 2025-261,536–2.1%
Period 11 of 2025-261,536–4.6%
Period 10 of 2025-261,39498.5%3.7%
Period 9 of 2025-261,536–4.6%
Period 8 of 2025-261,536–2.1%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out