Smithy Bridge
SMBNorth WestManaged by Northern Trains
How this station is performing
Smithy Bridge had 23,067 scheduled stops to Period 7 of 2026-27, about 63 a day. 70.8% of recorded arrivals were within three minutes of the timetable and 3.0% of scheduled stops were cancelled.
Smithy Bridge opened on 1 October 1868 and closed to passengers on 2 May 1960. It reopened on 19 August 1985, 41 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Littleborough is the oldest (1839) and Walsden the newest (1990), with Smithy Bridge in between.
The nearest stations to Smithy Bridge are Littleborough (1.7 km north-east), Rochdale (3.6 km south-west), Castleton (Manchester) (6.1 km south-west), Walsden (7.1 km north) and Todmorden (9.0 km north). 6 stations lie within 10 km in all. Of the five, Walsden is the most punctual at 74.8% and Todmorden the least at 63.2%, with Smithy Bridge on 70.8%.
Smithy Bridge takes its name from a Village called Smithy Bridge, and the station stands 0.2 km from its centre.
Smithy Bridge has slipped sharply. 70.8% of stops came within three minutes of the timetable in the latest 13 periods, 5.4 percentage points worse than the 76.2% recorded in the 13 before. Cancellations fell to 3.0% of scheduled stops from 5.1%, which is 2.1 percentage points fewer.
1 of 3 stations of a similar size in North West are more punctual than Smithy Bridge on 70.8%. The comparison group includes Burnage (67.1%), Mauldeth Road (66.9%) and Broadbottom (85.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 23,067 | 70.8% | 3.0% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,811 | 67.3% | 2.0% |
| Period 6 of 2026-27 | 1,797 | 76.7% | 1.9% |
| Period 5 of 2026-27 | 1,646 | 76.9% | 4.1% |
| Period 4 of 2026-27 | 1,549 | 73.3% | 3.5% |
| Period 3 of 2026-27 | 1,529 | 71.6% | 2.8% |
| Period 2 of 2026-27 | 1,812 | 61.3% | 3.6% |
| Period 1 of 2026-27 | 2,098 | 74.9% | 2.6% |
| Period 13 of 2025-26 | 1,962 | 74.1% | 2.2% |
| Period 12 of 2025-26 | 1,808 | 67.0% | 2.1% |
| Period 11 of 2025-26 | 1,808 | 68.0% | 2.5% |
| Period 10 of 2025-26 | 1,639 | 73.8% | 4.3% |
| Period 9 of 2025-26 | 1,801 | 65.9% | 4.9% |
| Period 8 of 2025-26 | 1,807 | 69.4% | 3.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Burnage | 23,086 | 67.1% | 6.6% |
| Mauldeth Road | 23,086 | 66.9% | 6.6% |
| Broadbottom | 23,022 | 85.4% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out