Sea Mills
SMLSouth WestManaged by Great Western Railway
How this station is performing
Sea Mills has usable figures for 8 of the last 13 four-week periods to Period 7 of 2026-27, covering 22,210 scheduled stops, about 61 a day. In those periods 71.4% of stops arrived within three minutes of the timetable and 3.9% of scheduled stops were cancelled.
Sea Mills opened on 6 March 1865, 161 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Sea Mills is the oldest; the next oldest, Shirehampton, dates from 1865.
The nearest stations to Sea Mills are Shirehampton (2.1 km west), Portway Park and Ride (2.8 km west), Clifton Down (3.1 km south-east), Redland (3.7 km east) and Avonmouth (4.1 km north-west). 19 stations lie within 10 km in all. Of the five, Clifton Down is the most punctual at 77.0% and Portway Park and Ride the least at 68.7%, with Sea Mills on 71.4%.
Sea Mills is one of 2 stations named after a suburb called Sea Mills; this one stands 0.9 km from its centre.
For Sea Mills, the weakest four-week period in the data is a recent one: Period 7 of 2026-27, when only 64.8% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2026-27, at 80.3%, which is 15.5 percentage points higher. Cancellations peaked at 14.3% of scheduled stops in Period 9 of 2024-25, against 3.9% over the latest 13 periods.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 22,210 | 71.4% | 3.9% |
Operators with their own page for this station are linked to it.
Late train at Sea Mills? Delay Repay
These operators call at Sea Mills and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,752 | 64.8% | 2.8% |
| Period 6 of 2026-27 | 1,452 | 71.1% | 2.6% |
| Period 5 of 2026-27 | 1,342 | 65.0% | 7.0% |
| Period 4 of 2026-27 | 1,752 | 67.3% | 9.9% |
| Period 3 of 2026-27 | 1,632 | 74.7% | 7.5% |
| Period 2 of 2026-27 | 1,746 | 70.1% | 4.1% |
| Period 1 of 2026-27 | 2,026 | 80.3% | 1.3% |
| Period 13 of 2025-26 | 1,916 | 78.0% | 2.5% |
| Period 12 of 2025-26 | 1,752 | – | 1.5% |
| Period 11 of 2025-26 | 1,752 | – | 2.2% |
| Period 10 of 2025-26 | 1,584 | – | 6.1% |
| Period 9 of 2025-26 | 1,752 | – | 3.5% |
| Period 8 of 2025-26 | 1,752 | – | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out