Transport for Wales at Runcorn East
All trains at Runcorn EastTransport for Wales across BritainNorth West
How this operator is doing here
Transport for Wales had 13,548 scheduled stops at Runcorn East in the 13 periods to Period 7 of 2026-27, 79% of the station's total. 75.5% of recorded arrivals came within three minutes and 0.9% of stops were cancelled.
Transport for Wales trains at Runcorn East also serve Runcorn (5.0 km west, 86.2% on time, 2.6% cancelled), Frodsham (5.2 km south-west, 79.2% on time, 1.7% cancelled), Warrington Bank Quay (7.7 km north-east, 74.4% on time, 1.2% cancelled), Helsby (9.1 km south-west, 77.4% on time, 1.7% cancelled), Earlestown (13.8 km north, 74.5% on time, 1.5% cancelled) and Newton-le-Willows (14.4 km north, 73.6% on time, 1.5% cancelled), which are the stations on its network closest to Runcorn East.
Within 30 km of here, Transport for Wales runs best at Bidston, 28.9 km west (87.3%), and worst at Wilmslow, 29.2 km east (68.6%).
The busiest Transport for Wales station within 30 km of Runcorn East is Chester, 20.4 km south-west, with about 163 scheduled stops a day.
Transport for Wales at Runcorn East has slipped a little, from 79.2% within three minutes in the previous 13 periods to 75.5% in the latest 13, a fall of 3.7 percentage points. Cancellations held steady at 0.9% of scheduled stops, against 1.0% before.
Period by period
See how Transport for Wales Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,034 | 72.4% | 0.8% |
| Period 6 of 2026-27 | 1,052 | 64.8% | 0.8% |
| Period 5 of 2026-27 | 1,035 | 68.1% | 1.6% |
| Period 4 of 2026-27 | 1,045 | 71.8% | 1.7% |
| Period 3 of 2026-27 | 1,018 | 70.5% | 1.1% |
| Period 2 of 2026-27 | 995 | 73.8% | 1.1% |
| Period 1 of 2026-27 | 1,178 | 81.5% | 0.3% |
| Period 13 of 2025-26 | 1,105 | 85.5% | 0.5% |
| Period 12 of 2025-26 | 1,036 | 84.1% | 0.6% |
| Period 11 of 2025-26 | 1,012 | 83.0% | 0.7% |
| Period 10 of 2025-26 | 977 | 80.3% | 0.5% |
| Period 9 of 2025-26 | 1,012 | 67.3% | 0.7% |
| Period 8 of 2025-26 | 1,049 | 76.5% | 1.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Runcorn East
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 3,665 | 67.9% | 6.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out