Rose Grove
RSGNorth WestManaged by Northern Trains
How this station is performing
Rose Grove had 23,703 scheduled stops to Period 7 of 2026-27, about 65 a day. 75.4% of recorded arrivals were within three minutes of the timetable and 3.5% of scheduled stops were cancelled.
Rose Grove opened on 18 September 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Rose Grove is the oldest; the next oldest, Burnley Barracks, dates from 1848.
The nearest stations to Rose Grove are Burnley Barracks (1.7 km east), Burnley Manchester Road (2.2 km east), Hapton (2.4 km west), Burnley Central (2.6 km east) and Huncoat (4.5 km west). 11 stations lie within 10 km in all. Of the five, Burnley Central is the most punctual at 82.8% and Burnley Manchester Road the least at 71.5%, with Rose Grove on 75.4%.
Rose Grove takes its name from a suburb called Rose Grove, and the station stands 0.2 km from its centre.
For Rose Grove, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 62.9% of stops arrived within three minutes of the timetable. The strongest was Period 13 of 2024-25, at 88.6%, which is 25.7 percentage points higher. Cancellations peaked at 7.3% of scheduled stops in Period 10 of 2023-24, against 3.5% over the latest 13 periods.
2 of 3 stations of a similar size in North West are more punctual than Rose Grove on 75.4%. The comparison group includes Marple (83.3%), Widnes (67.0%) and Hazel Grove (85.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 23,703 | 75.4% | 3.5% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,844 | 73.5% | 2.8% |
| Period 6 of 2026-27 | 1,833 | 81.1% | 1.9% |
| Period 5 of 2026-27 | 1,756 | 78.3% | 4.8% |
| Period 4 of 2026-27 | 1,772 | 75.7% | 6.5% |
| Period 3 of 2026-27 | 1,696 | 77.8% | 2.8% |
| Period 2 of 2026-27 | 1,844 | 72.5% | 4.9% |
| Period 1 of 2026-27 | 2,126 | 80.0% | 3.5% |
| Period 13 of 2025-26 | 2,009 | 78.6% | 2.3% |
| Period 12 of 2025-26 | 1,840 | 73.3% | 2.4% |
| Period 11 of 2025-26 | 1,840 | 76.6% | 1.9% |
| Period 10 of 2025-26 | 1,685 | 78.6% | 5.4% |
| Period 9 of 2025-26 | 1,732 | 62.9% | 4.1% |
| Period 8 of 2025-26 | 1,726 | 69.7% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Marple | 23,781 | 83.3% | 2.5% |
| Widnes | 23,786 | 67.0% | 4.6% |
| Hazel Grove | 23,895 | 85.1% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out