Romsey
ROMSouth EastManaged by South Western Railway
How this station is performing
Romsey had 37,684 scheduled stops to Period 7 of 2026-27, about 104 a day. 71.3% of recorded arrivals were within three minutes of the timetable and 2.9% of scheduled stops were cancelled.
Romsey opened on 1 March 1847, 179 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Romsey is the oldest; the next oldest, Mottisfont and Dunbridge, dates from 1847.
The nearest stations to Romsey are Mottisfont and Dunbridge (6.0 km north-west), Chandlers Ford (7.6 km east), Redbridge (8.3 km south), Totton (8.4 km south) and Millbrook (Hants) (9.9 km south-east). 6 stations lie within 10 km in all. Of the five, Millbrook (Hants) is the most punctual at 79.1% and Totton the least at 68.7%, with Romsey on 71.3%.
Romsey takes its name from a market town called Romsey, home to about 14,768 people, and the station stands 0.5 km from its centre.
2 operators call at Romsey: South Western Railway (74.3%, 67% of stops) and Great Western Railway (65.3%, 33% of stops). The operator you travel with matters: South Western Railway reaches 74.3% within three minutes while Great Western Railway manages 65.3%, a gap of 9.0 percentage points.
Compared with 3 stations of a similar size in South East, Romsey is the least punctual, at 71.3%. All of them are ahead, including Clandon (86.2%), Horsley (85.2%) and Bexhill (82.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 25,130 | 74.3% | 2.4% |
| Great Western Railway | 12,554 | 65.3% | 3.8% |
Operators with their own page for this station are linked to it.
Late train at Romsey? Delay Repay
These operators call at Romsey and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,732 | 67.2% | 1.1% |
| Period 6 of 2026-27 | 2,951 | 68.7% | 1.9% |
| Period 5 of 2026-27 | 2,844 | 63.3% | 2.6% |
| Period 4 of 2026-27 | 2,959 | 61.3% | 4.6% |
| Period 3 of 2026-27 | 2,955 | 71.8% | 5.2% |
| Period 2 of 2026-27 | 2,904 | 70.6% | 3.9% |
| Period 1 of 2026-27 | 3,121 | 77.9% | 1.6% |
| Period 13 of 2025-26 | 3,195 | 79.7% | 1.7% |
| Period 12 of 2025-26 | 2,702 | 77.2% | 0.6% |
| Period 11 of 2025-26 | 2,961 | 80.4% | 4.8% |
| Period 10 of 2025-26 | 2,682 | 73.7% | 4.1% |
| Period 9 of 2025-26 | 2,812 | 65.9% | 1.9% |
| Period 8 of 2025-26 | 2,866 | 68.1% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out