Northern at Roby
How this operator is doing here
Northern had 37,021 scheduled stops at Roby in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 81.4% of recorded arrivals came within three minutes and 3.3% of stops were cancelled.
Northern trains at Roby also serve Huyton (0.9 km east, 80.5% on time, 2.4% cancelled), Broad Green (2.5 km west, 79.4% on time, 3.2% cancelled), Whiston (4.0 km east, 68.1% on time, 3.1% cancelled), Prescot (4.1 km east, 89.6% on time, 2.5% cancelled), Wavertree Technology Park (4.5 km west, 80.9% on time, 3.3% cancelled) and Mossley Hill (5.2 km south-west, 77.7% on time, 3.5% cancelled), which are the stations on its network closest to Roby.
Within 30 km of here, Northern runs best at Thatto Heath, 7.0 km north-east (90.7%), and worst at Blackrod, 27.7 km north-east (56.3%).
The busiest Northern station within 30 km of Roby is Liverpool Lime Street, 8.1 km west, with about 193 scheduled stops a day.
Of the 1 operators with enough records at Roby, Northern is the most punctual, at 81.4%.
For Northern, Roby is the 215th best of 493 ranked stations. Its 81.4% here is 2.8 percentage points above the 78.6% across the whole network.
Northern at Roby has edged up: 81.4% of stops came within three minutes of the timetable in the latest 13 periods, 2.2 percentage points better than the 79.2% of the 13 before. Cancellations fell to 3.3% of scheduled stops from 5.6%, which is 2.3 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,864 | 82.5% | 2.1% |
| Period 6 of 2026-27 | 2,842 | 83.6% | 2.3% |
| Period 5 of 2026-27 | 2,843 | 83.3% | 4.8% |
| Period 4 of 2026-27 | 2,867 | 84.4% | 2.3% |
| Period 3 of 2026-27 | 2,553 | 83.5% | 3.0% |
| Period 2 of 2026-27 | 2,697 | 83.8% | 2.4% |
| Period 1 of 2026-27 | 3,307 | 85.0% | 1.9% |
| Period 13 of 2025-26 | 3,082 | 81.6% | 3.2% |
| Period 12 of 2025-26 | 2,864 | 84.3% | 2.3% |
| Period 11 of 2025-26 | 2,845 | 83.5% | 1.7% |
| Period 10 of 2025-26 | 2,599 | 75.8% | 7.1% |
| Period 9 of 2025-26 | 2,816 | 70.8% | 4.8% |
| Period 8 of 2025-26 | 2,842 | 74.8% | 5.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out