Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Redland

RDASouth WestManaged by Great Western Railway

On time, last 13 periods73.3%Great Britain: 83.6%
Cancelled3.5%Great Britain: 3.2%
Stops a day62Scheduled, on average
Punctuality rankNot rankedAmong ranked stations

How this station is performing

Redland has usable figures for 8 of the last 13 four-week periods to Period 7 of 2026-27, covering 22,718 scheduled stops, about 62 a day. In those periods 73.3% of stops arrived within three minutes of the timetable and 3.5% of scheduled stops were cancelled.

Redland opened on 12 April 1897, 129 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Redland is the newest; the oldest, Bristol Temple Meads, opened in 1840.

The nearest stations to Redland are Montpelier (0.7 km east), Clifton Down (1.0 km south-west), Ashley Down (1.9 km north-east), Stapleton Road (2.3 km east) and Bristol Temple Meads (2.5 km south-east). 18 stations lie within 10 km in all. Of the five, Ashley Down is the most punctual at 84.7% and Bristol Temple Meads the least at 70.8%, with Redland on 73.3%.

Redland takes its name from a neighborhood called Redland, and the station stands 0.6 km from its centre.

For Redland, the weakest four-week period in the data is a recent one: Period 5 of 2026-27, when only 66.9% of stops arrived within three minutes of the timetable. The strongest was Period 13 of 2025-26, at 79.6%, which is 12.7 percentage points higher. Cancellations peaked at 13.3% of scheduled stops in Period 9 of 2024-25, against 3.5% over the latest 13 periods.

Period by period

60%70%80%90%2023-242024-252025-262026-27Period 13 of 2025-26: 79.6%Period 1 of 2026-27: 78.9%Period 2 of 2026-27: 71.9%Period 3 of 2026-27: 77.0%Period 4 of 2026-27: 69.6%Period 5 of 2026-27: 66.9%Period 6 of 2026-27: 71.9%Period 7 of 2026-27: 69.9%
This pageGreat Britain
0%5%10%15%Period 1 of 2023-24: 1.8%Period 2 of 2023-24: 1.0%Period 3 of 2023-24: 4.6%Period 4 of 2023-24: 2.4%Period 5 of 2023-24: 2.9%Period 6 of 2023-24: 5.2%Period 7 of 2023-24: 2.5%Period 8 of 2023-24: 4.2%Period 9 of 2023-24: 6.1%Period 10 of 2023-24: 5.6%Period 11 of 2023-24: 3.5%Period 12 of 2023-24: 2.6%Period 13 of 2023-24: 2.8%Period 1 of 2024-25: 4.0%Period 2 of 2024-25: 4.4%Period 3 of 2024-25: 4.5%Period 4 of 2024-25: 7.9%Period 5 of 2024-25: 8.1%Period 6 of 2024-25: 5.7%Period 7 of 2024-25: 5.6%Period 8 of 2024-25: 6.6%Period 9 of 2024-25: 13.3%Period 10 of 2024-25: 7.2%Period 11 of 2024-25: 1.8%Period 12 of 2024-25: 3.6%Period 13 of 2024-25: 2.3%Period 1 of 2025-26: 4.4%Period 2 of 2025-26: 2.8%Period 3 of 2025-26: 3.0%Period 4 of 2025-26: 7.1%Period 5 of 2025-26: 4.6%Period 6 of 2025-26: 3.2%Period 7 of 2025-26: 4.3%Period 8 of 2025-26: 1.3%Period 9 of 2025-26: 3.2%Period 10 of 2025-26: 5.7%Period 11 of 2025-26: 1.6%Period 12 of 2025-26: 1.1%Period 13 of 2025-26: 2.2%Period 1 of 2026-27: 0.9%Period 2 of 2026-27: 3.7%Period 3 of 2026-27: 7.3%Period 4 of 2026-27: 9.4%Period 5 of 2026-27: 6.9%Period 6 of 2026-27: 2.2%Period 7 of 2026-27: 1.6%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Great Western Railway22,71873.3%3.5%

Operators with their own page for this station are linked to it.

Late train at Redland? Delay Repay

These operators call at Redland and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,79269.9%1.6%
Period 6 of 2026-271,48471.9%2.2%
Period 5 of 2026-271,37266.9%6.9%
Period 4 of 2026-271,79269.6%9.4%
Period 3 of 2026-271,67277.0%7.3%
Period 2 of 2026-271,78671.9%3.7%
Period 1 of 2026-272,07278.9%0.9%
Period 13 of 2025-261,96079.6%2.2%
Period 12 of 2025-261,792–1.1%
Period 11 of 2025-261,792–1.6%
Period 10 of 2025-261,620–5.7%
Period 9 of 2025-261,792–3.2%
Period 8 of 2025-261,792–1.3%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out