Northern had 14,886 scheduled stops at Rainhill in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 70.5% of recorded arrivals came within three minutes and 3.1% of stops were cancelled.
Northern trains at Rainhill also serve Eccleston Park (1.8 km north-west, 90.6% on time, 2.5% cancelled), Whiston (2.0 km west, 68.1% on time, 3.1% cancelled), Thatto Heath (2.2 km north, 90.7% on time, 2.5% cancelled), Prescot (2.3 km west, 89.6% on time, 2.5% cancelled), Lea Green (2.9 km east, 67.6% on time, 3.1% cancelled) and St Helens Central (4.6 km north-east, 88.1% on time, 2.5% cancelled), which are the stations on its network closest to Rainhill.
Within 30 km of here, Northern runs best at Thatto Heath, 2.2 km north (90.7%), and worst at Moses Gate, 28.7 km north-east (52.6%).
The busiest Northern station within 30 km of Rainhill is Bolton, 28.5 km north-east, with about 209 scheduled stops a day.
Northern at Rainhill has edged up: 70.5% of stops came within three minutes of the timetable in the latest 13 periods, 3.6 percentage points better than the 66.9% of the 13 before. Cancellations fell to 3.1% of scheduled stops from 5.7%, which is 2.6 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,156 | 71.1% | 1.8% |
| Period 6 of 2026-27 | 1,139 | 74.5% | 1.8% |
| Period 5 of 2026-27 | 1,137 | 72.1% | 4.1% |
| Period 4 of 2026-27 | 1,158 | 74.4% | 2.5% |
| Period 3 of 2026-27 | 1,001 | 72.5% | 2.3% |
| Period 2 of 2026-27 | 1,130 | 75.2% | 1.8% |
| Period 1 of 2026-27 | 1,326 | 74.8% | 2.0% |
| Period 13 of 2025-26 | 1,223 | 74.2% | 2.7% |
| Period 12 of 2025-26 | 1,156 | 77.4% | 2.9% |
| Period 11 of 2025-26 | 1,141 | 73.6% | 1.9% |
| Period 10 of 2025-26 | 1,048 | 64.2% | 6.9% |
| Period 9 of 2025-26 | 1,130 | 51.8% | 4.2% |
| Period 8 of 2025-26 | 1,141 | 58.6% | 5.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Rainhill
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Avanti | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out