TransPennine Express at Preston (Lancs)
All trains at Preston (Lancs)TransPennine Express across BritainNorth West
How this operator is doing here
TransPennine Express had 14,657 scheduled stops at Preston (Lancs) in the 13 periods to Period 7 of 2026-27, 11% of the station's total. 64.9% of recorded arrivals came within three minutes and 4.6% of stops were cancelled.
TransPennine Express trains at Preston (Lancs) also serve Buckshaw Parkway (9.7 km south, 90.2% on time, 4.2% cancelled), Chorley (12.6 km south-east, 81.1% on time, 4.3% cancelled), Blackrod (20.4 km south-east, – on time, – cancelled), Horwich Parkway (22.6 km south-east, 81.6% on time, 4.3% cancelled), Wigan North Western (24.1 km south, 69.7% on time, 8.1% cancelled) and Bolton (27.5 km south-east, 58.3% on time, 5.0% cancelled), which are the stations on its network closest to Preston (Lancs).
The busiest TransPennine Express station within 30 km of Preston (Lancs) is Bolton, 27.5 km south-east, with about 24 scheduled stops a day.
TransPennine Express ranks 3rd of the 5 operators with enough records at Preston (Lancs), on 64.9%.
For TransPennine Express, Preston (Lancs) is the 57th best of 77 ranked stations. Its 64.9% here is 3.9 percentage points below the 68.8% across the whole network.
Over three full railway years TransPennine Express at Preston (Lancs) has got worse each time, from 70.1% within three minutes in 2023-24 to 67.6% in 2024-25 and 64.8% in 2025-26.
Period by period
See how TransPennine Express Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,137 | 64.8% | 3.4% |
| Period 6 of 2026-27 | 1,140 | 65.2% | 3.6% |
| Period 5 of 2026-27 | 1,142 | 65.0% | 5.1% |
| Period 4 of 2026-27 | 1,144 | 63.3% | 5.8% |
| Period 3 of 2026-27 | 1,130 | 64.7% | 3.4% |
| Period 2 of 2026-27 | 1,137 | 67.0% | 3.0% |
| Period 1 of 2026-27 | 1,287 | 75.7% | 4.5% |
| Period 13 of 2025-26 | 1,133 | 71.9% | 5.0% |
| Period 12 of 2025-26 | 1,147 | 71.0% | 5.7% |
| Period 11 of 2025-26 | 1,106 | 74.7% | 1.7% |
| Period 10 of 2025-26 | 893 | 54.7% | 6.4% |
| Period 9 of 2025-26 | 1,131 | 44.4% | 6.5% |
| Period 8 of 2025-26 | 1,130 | 56.7% | 6.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Preston (Lancs)
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 94,641 | 79.0% | 3.3% |
| Avanti | 22,570 | 52.1% | 4.0% |
| Lumo (West Coast) | 1,003 | 57.3% | 4.4% |
| Caledonian Sleeper | 552 | 66.1% | 0.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out