Northern at Poulton-le-Fylde
All trains at Poulton-le-FyldeNorthern across BritainNorth West
How this operator is doing here
Northern had 48,742 scheduled stops at Poulton-le-Fylde in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 80.7% of recorded arrivals came within three minutes and 4.7% of stops were cancelled.
Northern trains at Poulton-le-Fylde also serve Layton (Lancs) (3.0 km south-west, 80.4% on time, 4.9% cancelled), Blackpool North (4.7 km south-west, 82.3% on time, 4.0% cancelled), Blackpool South (6.7 km south-west, 74.6% on time, 4.0% cancelled), Blackpool Pleasure Beach (7.9 km south-west, 75.8% on time, 4.3% cancelled), Squires Gate (8.8 km south-west, 75.8% on time, 4.3% cancelled) and Kirkham and Wesham (9.8 km south-east, 77.4% on time, 4.6% cancelled), which are the stations on its network closest to Poulton-le-Fylde.
Within 30 km of here, Northern runs best at Rufford, 26.6 km south-east (89.5%), and worst at Buckshaw Parkway, 29.2 km south-east (59.6%).
The busiest Northern station within 30 km of Poulton-le-Fylde is Preston (Lancs), 21.2 km south-east, with about 260 scheduled stops a day.
Of the 1 operators with enough records at Poulton-le-Fylde, Northern is the most punctual, at 80.7%.
For Northern, Poulton-le-Fylde is the 225th best of 493 ranked stations. Its 80.7% here is 2.1 percentage points above the 78.6% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,762 | 81.1% | 4.1% |
| Period 6 of 2026-27 | 3,752 | 83.6% | 3.8% |
| Period 5 of 2026-27 | 3,768 | 80.4% | 5.9% |
| Period 4 of 2026-27 | 3,766 | 79.5% | 4.1% |
| Period 3 of 2026-27 | 3,760 | 80.0% | 5.2% |
| Period 2 of 2026-27 | 3,767 | 81.5% | 4.0% |
| Period 1 of 2026-27 | 4,344 | 83.9% | 3.4% |
| Period 13 of 2025-26 | 4,121 | 83.1% | 7.7% |
| Period 12 of 2025-26 | 3,676 | 83.1% | 2.6% |
| Period 11 of 2025-26 | 3,642 | 85.5% | 3.6% |
| Period 10 of 2025-26 | 3,092 | 77.9% | 8.4% |
| Period 9 of 2025-26 | 3,654 | 71.1% | 5.0% |
| Period 8 of 2025-26 | 3,638 | 77.1% | 3.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Poulton-le-Fylde
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Avanti | 44 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out