Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Portway Park and Ride

PRISouth WestManaged by Great Western Railway

On time, last 13 periods68.7%Great Britain: 83.6%
Cancelled3.9%Great Britain: 3.2%
Stops a day61Scheduled, on average
Punctuality rankNot rankedAmong ranked stations

How this station is performing

Portway Park and Ride has usable figures for 8 of the last 13 four-week periods to Period 7 of 2026-27, covering 22,055 scheduled stops, about 61 a day. In those periods 68.7% of stops arrived within three minutes of the timetable and 3.9% of scheduled stops were cancelled.

Portway Park and Ride opened on 1 August 2023, 3 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Portway Park and Ride is the newest; the oldest, Shirehampton, opened in 1865.

The nearest stations to Portway Park and Ride are Shirehampton (0.7 km south-east), Avonmouth (1.5 km north-west), St Andrews Road (2.8 km north), Sea Mills (2.8 km east) and Clifton Down (5.9 km south-east). 18 stations lie within 10 km in all. At 68.7%, Portway Park and Ride is less punctual than all of them; the best of the five, St Andrews Road, manages 78.6%.

For Portway Park and Ride, the weakest four-week period in the data is a recent one: Period 7 of 2026-27, when only 60.8% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2026-27, at 77.0%, which is 16.2 percentage points higher. Cancellations peaked at 14.2% of scheduled stops in Period 9 of 2024-25, against 3.9% over the latest 13 periods.

Period by period

60%70%80%90%2023-242024-252025-262026-27Period 13 of 2025-26: 76.2%Period 1 of 2026-27: 77.0%Period 2 of 2026-27: 68.0%Period 3 of 2026-27: 73.0%Period 4 of 2026-27: 64.0%Period 5 of 2026-27: 62.6%Period 6 of 2026-27: 68.6%Period 7 of 2026-27: 60.8%
This pageGreat Britain
0%5%10%15%Period 5 of 2023-24: 3.6%Period 6 of 2023-24: 5.4%Period 7 of 2023-24: 2.9%Period 8 of 2023-24: 4.6%Period 9 of 2023-24: 6.3%Period 10 of 2023-24: 5.8%Period 11 of 2023-24: 3.6%Period 12 of 2023-24: 5.3%Period 13 of 2023-24: 4.4%Period 1 of 2024-25: 6.7%Period 2 of 2024-25: 5.9%Period 3 of 2024-25: 4.5%Period 4 of 2024-25: 8.0%Period 5 of 2024-25: 8.2%Period 6 of 2024-25: 6.1%Period 7 of 2024-25: 7.8%Period 8 of 2024-25: 7.2%Period 9 of 2024-25: 14.2%Period 10 of 2024-25: 7.4%Period 11 of 2024-25: 2.0%Period 12 of 2024-25: 3.7%Period 13 of 2024-25: 2.7%Period 1 of 2025-26: 5.1%Period 2 of 2025-26: 3.2%Period 3 of 2025-26: 3.2%Period 4 of 2025-26: 7.3%Period 5 of 2025-26: 6.3%Period 6 of 2025-26: 3.4%Period 7 of 2025-26: 4.4%Period 8 of 2025-26: 1.7%Period 9 of 2025-26: 3.5%Period 10 of 2025-26: 6.0%Period 11 of 2025-26: 2.2%Period 12 of 2025-26: 1.6%Period 13 of 2025-26: 2.5%Period 1 of 2026-27: 1.3%Period 2 of 2026-27: 4.1%Period 3 of 2026-27: 7.6%Period 4 of 2026-27: 9.7%Period 5 of 2026-27: 7.1%Period 6 of 2026-27: 2.6%Period 7 of 2026-27: 2.8%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Great Western Railway22,05568.7%3.9%

Operators with their own page for this station are linked to it.

Late train at Portway Park and Ride? Delay Repay

These operators call at Portway Park and Ride and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,74060.8%2.8%
Period 6 of 2026-271,44268.6%2.6%
Period 5 of 2026-271,33162.6%7.1%
Period 4 of 2026-271,74164.0%9.7%
Period 3 of 2026-271,62073.0%7.6%
Period 2 of 2026-271,73468.0%4.1%
Period 1 of 2026-272,01377.0%1.3%
Period 13 of 2025-261,90276.2%2.5%
Period 12 of 2025-261,740–1.6%
Period 11 of 2025-261,740–2.2%
Period 10 of 2025-261,572–6.0%
Period 9 of 2025-261,740–3.5%
Period 8 of 2025-261,740–1.7%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out