Portsmouth and Southsea
PMSSouth EastManaged by South Western Railway
How this station is performing
Portsmouth and Southsea had 101,548 scheduled stops to Period 7 of 2026-27, about 279 a day. 72.2% of recorded arrivals were within three minutes of the timetable and 7.0% of scheduled stops were cancelled.
Portsmouth and Southsea opened on 14 July 1847, 179 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Portsmouth and Southsea is the oldest; the next oldest, Cosham, dates from 1848.
The nearest stations to Portsmouth and Southsea are Fratton (1.2 km east), Portsmouth Harbour (1.3 km west), Hilsea (4.0 km north-east), Cosham (5.1 km north) and Portchester (6.1 km north-west). 11 stations lie within 10 km in all. Of the five, Hilsea is the most punctual at 76.7% and Cosham the least at 71.7%, with Portsmouth and Southsea on 72.2%.
Portsmouth and Southsea is named after Southsea, a town, home to about 18,514 people, but the station stands 2.1 km from its centre.
3 operators call at Portsmouth and Southsea: South Western Railway (73.1%, 56% of stops), GTR (73.7%, 33% of stops) and Great Western Railway (63.9%, 11% of stops). The operator you travel with matters: GTR reaches 73.7% within three minutes while Great Western Railway manages 63.9%, a gap of 9.8 percentage points.
2 of 3 stations of a similar size in South East are more punctual than Portsmouth and Southsea on 72.2%. The comparison group includes Fratton (72.5%), Milton Keynes Central (63.1%) and Ashford International (78.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 56,475 | 73.1% | 3.1% |
| GTR | 33,557 | 73.7% | 13.4% |
| Great Western Railway | 11,516 | 63.9% | 7.3% |
Operators with their own page for this station are linked to it.
Late train at Portsmouth and Southsea? Delay Repay
These operators call at Portsmouth and Southsea and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 7,581 | 66.7% | 6.3% |
| Period 6 of 2026-27 | 7,396 | 66.4% | 6.2% |
| Period 5 of 2026-27 | 8,062 | 68.8% | 9.3% |
| Period 4 of 2026-27 | 8,059 | 71.0% | 8.5% |
| Period 3 of 2026-27 | 8,031 | 73.8% | 7.9% |
| Period 2 of 2026-27 | 6,656 | 73.5% | 9.0% |
| Period 1 of 2026-27 | 8,532 | 74.8% | 5.6% |
| Period 13 of 2025-26 | 7,568 | 75.7% | 6.3% |
| Period 12 of 2025-26 | 7,792 | 75.2% | 5.2% |
| Period 11 of 2025-26 | 8,210 | 76.7% | 5.4% |
| Period 10 of 2025-26 | 7,443 | 68.3% | 7.0% |
| Period 9 of 2025-26 | 8,059 | 69.5% | 8.3% |
| Period 8 of 2025-26 | 8,159 | 77.6% | 5.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Fratton | 101,951 | 72.5% | 5.1% |
| Milton Keynes Central | 102,269 | 63.1% | 4.7% |
| Ashford International | 97,043 | 78.7% | 1.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out