Pontypool and New Inn
PPLWalesManaged by TfW Rail
How this station is performing
Pontypool and New Inn has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 13,750 scheduled stops, about 38 a day. In those periods 73.0% of stops arrived within three minutes of the timetable and 3.3% of scheduled stops were cancelled.
Pontypool and New Inn opened on 2 January 1854. It was moved to the site it uses now on 1 March 1909. Among the 5 stations nearest to it with a known opening date, Newbridge is the oldest (1850) and Llanhilleth the newest (1901), with Pontypool and New Inn in between.
The nearest stations to Pontypool and New Inn are Cwmbran (4.5 km south), Llanhilleth (8.3 km west), Newbridge (9.6 km west), Crosskeys (11.5 km south-west) and Risca and Pontymister (11.5 km south-west). 3 stations lie within 10 km in all. Of the five, Risca and Pontymister is the most punctual at 87.3% and Cwmbran the least at 68.2%, with Pontypool and New Inn on 73.0%.
Pontypool and New Inn is named after Pontypool, a town, home to about 29,062 people, but the station stands 2.0 km from its centre.
Compared with 3 stations of a similar size in Wales, Pontypool and New Inn is the least punctual, at 73.0%. All of them are ahead, including Buckley (80.7%), Caergwrle (78.5%) and Cefn-y-bedd (77.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 13,750 | 73.0% | 3.3% |
Operators with their own page for this station are linked to it.
Late train at Pontypool and New Inn? Delay Repay
These operators call at Pontypool and New Inn and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,070 | 72.5% | 2.1% |
| Period 6 of 2026-27 | 1,060 | 67.6% | 3.1% |
| Period 5 of 2026-27 | 985 | 66.9% | 5.4% |
| Period 4 of 2026-27 | 1,005 | – | 4.9% |
| Period 3 of 2026-27 | 1,046 | 75.5% | 2.4% |
| Period 2 of 2026-27 | 1,067 | 77.3% | 2.6% |
| Period 1 of 2026-27 | 1,235 | 80.1% | 1.9% |
| Period 13 of 2025-26 | 1,173 | 78.6% | 2.6% |
| Period 12 of 2025-26 | 1,072 | 81.6% | 1.2% |
| Period 11 of 2025-26 | 1,043 | 80.1% | 4.9% |
| Period 10 of 2025-26 | 970 | 71.2% | 2.6% |
| Period 9 of 2025-26 | 964 | 53.8% | 5.9% |
| Period 8 of 2025-26 | 1,060 | 64.8% | 3.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Buckley | 13,328 | 80.7% | 4.1% |
| Caergwrle | 13,328 | 78.5% | 4.1% |
| Cefn-y-bedd | 13,328 | 77.9% | 4.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out