How punctual is your station? Every stop, every operator, every four weeks.

Penychain

PNCWalesManaged by TfW Rail

On time, last 13 periods84.1%Great Britain: 83.6%
Cancelled1.8%Great Britain: 3.2%
Stops a day15Scheduled, on average
Punctuality rankNot rankedAmong ranked stations

How this station is performing

Penychain has usable figures for 2 of the last 13 four-week periods to Period 7 of 2026-27, covering 5,355 scheduled stops, about 15 a day. In those periods 84.1% of stops arrived within three minutes of the timetable and 1.8% of scheduled stops were cancelled.

Penychain opened on 31 July 1933, 93 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Penychain is the newest; the oldest, Abererch, opened in 1867.

The nearest stations to Penychain are Abererch (2.4 km west), Pwllheli (5.5 km west), Criccieth (7.0 km east), Porthmadog (14.0 km east) and Harlech (16.1 km east). 3 stations lie within 10 km in all. Of the five, Criccieth is the most punctual at 89.3% and Harlech the least at 82.1%, with Penychain on 84.1%.

Across the whole run of data, the weakest four-week period for Penychain was Period 5 of 2025-26, at 71.5%, some time before the latest year. The strongest was Period 1 of 2026-27, at 87.8%, and the two are 16.3 percentage points apart.

Transport for Wales is the only operator serving Penychain. Here it manages 84.1% within three minutes, 0.9 percentage points worse than its 85.0% across its whole network.

Period by period

70%80%90%2023-242024-252025-262026-27Period 6 of 2024-25: 74.2%Period 7 of 2024-25: 84.5%Period 8 of 2024-25: 82.2%Period 13 of 2024-25: 87.7%Period 1 of 2025-26: 80.4%Period 2 of 2025-26: 80.7%Period 3 of 2025-26: 83.5%Period 4 of 2025-26: 77.9%Period 5 of 2025-26: 71.5%Period 6 of 2025-26: 75.0%Period 1 of 2026-27: 87.8%Period 3 of 2026-27: 79.7%
This pageGreat Britain
0%2%4%6%Period 1 of 2023-24: 1.6%Period 2 of 2023-24: 0.0%Period 3 of 2023-24: 0.9%Period 4 of 2023-24: 2.1%Period 5 of 2023-24: 2.1%Period 6 of 2023-24: 2.1%Period 9 of 2023-24: 2.5%Period 10 of 2023-24: 1.8%Period 11 of 2023-24: 0.9%Period 12 of 2023-24: 0.7%Period 13 of 2023-24: 0.5%Period 1 of 2024-25: 0.5%Period 2 of 2024-25: 0.5%Period 3 of 2024-25: 0.9%Period 4 of 2024-25: 0.7%Period 5 of 2024-25: 1.9%Period 6 of 2024-25: 0.7%Period 7 of 2024-25: 0.2%Period 8 of 2024-25: 0.7%Period 9 of 2024-25: 3.1%Period 10 of 2024-25: 0.0%Period 11 of 2024-25: 1.9%Period 12 of 2024-25: 2.1%Period 13 of 2024-25: 0.0%Period 1 of 2025-26: 0.5%Period 2 of 2025-26: 0.2%Period 3 of 2025-26: 0.2%Period 4 of 2025-26: 2.2%Period 5 of 2025-26: 0.2%Period 6 of 2025-26: 2.3%Period 7 of 2025-26: 0.9%Period 8 of 2025-26: 1.9%Period 9 of 2025-26: 2.4%Period 10 of 2025-26: 2.1%Period 11 of 2025-26: 1.0%Period 12 of 2025-26: 0.0%Period 13 of 2025-26: 0.4%Period 1 of 2026-27: 1.0%Period 2 of 2026-27: 1.7%Period 3 of 2026-27: 2.6%Period 4 of 2026-27: 2.8%Period 5 of 2026-27: 4.4%Period 6 of 2026-27: 1.4%Period 7 of 2026-27: 0.7%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Transport for Wales5,35584.1%1.8%

Operators with their own page for this station are linked to it.

Late train at Penychain? Delay Repay

These operators call at Penychain and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-27424–0.7%
Period 6 of 2026-27430–1.4%
Period 5 of 2026-27427–4.4%
Period 4 of 2026-27426–2.8%
Period 3 of 2026-2742479.7%2.6%
Period 2 of 2026-27357–1.7%
Period 1 of 2026-2748787.8%1.0%
Period 13 of 2025-26466–0.4%
Period 12 of 2025-26287–0.0%
Period 11 of 2025-26392–1.0%
Period 10 of 2025-26387–2.1%
Period 9 of 2025-26424–2.4%
Period 8 of 2025-26424–1.9%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out