Penryn (Cornwall)
PYNSouth WestManaged by Great Western Railway
How this station is performing
Penryn (Cornwall) had 20,261 scheduled stops to Period 7 of 2026-27, about 56 a day. 88.3% of recorded arrivals were within three minutes of the timetable and 4.7% of scheduled stops were cancelled.
Penryn (Cornwall) opened on 24 August 1863, 163 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Redruth is the oldest (1843) and Falmouth Town the newest (1970), with Penryn (Cornwall) in between.
The nearest stations to Penryn (Cornwall) are Penmere (3.0 km south-east), Falmouth Town (4.1 km south-east), Falmouth Docks (4.5 km south-east), Perranwell (5.1 km north) and Redruth (10.7 km north-west). 4 stations lie within 10 km in all. Of the five, Falmouth Docks is the most punctual at 90.5% and Redruth the least at 69.2%, with Penryn (Cornwall) on 88.3%.
Penryn (Cornwall) is named after Penryn, a town, home to about 8,489 people, but the station stands 0.4 km from its centre.
Penryn (Cornwall) has slipped a little, from 92.4% within three minutes in the previous 13 periods to 88.3% in the latest 13, a fall of 4.1 percentage points. Cancellations rose to 4.7% of scheduled stops from 3.0%, which is 1.7 percentage points more.
2 of 3 stations of a similar size in South West are more punctual than Penryn (Cornwall) on 88.3%. The comparison group includes Penmere (88.0%), Falmouth Docks (90.5%) and Falmouth Town (88.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 20,261 | 88.3% | 4.7% |
Operators with their own page for this station are linked to it.
Late train at Penryn (Cornwall)? Delay Repay
These operators call at Penryn (Cornwall) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,552 | 91.4% | 4.9% |
| Period 6 of 2026-27 | 1,552 | 88.0% | 3.5% |
| Period 5 of 2026-27 | 1,532 | 86.0% | 9.1% |
| Period 4 of 2026-27 | 1,552 | 84.0% | 5.6% |
| Period 3 of 2026-27 | 1,484 | 86.6% | 8.1% |
| Period 2 of 2026-27 | 1,552 | 86.6% | 2.6% |
| Period 1 of 2026-27 | 1,792 | 92.0% | 2.1% |
| Period 13 of 2025-26 | 1,700 | 89.5% | 3.1% |
| Period 12 of 2025-26 | 1,552 | 95.3% | 1.7% |
| Period 11 of 2025-26 | 1,465 | 90.3% | 10.1% |
| Period 10 of 2025-26 | 1,424 | 88.0% | 7.3% |
| Period 9 of 2025-26 | 1,552 | 84.0% | 2.7% |
| Period 8 of 2025-26 | 1,552 | 85.8% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Penmere | 20,261 | 88.0% | 4.7% |
| Falmouth Docks | 20,211 | 90.5% | 4.6% |
| Falmouth Town | 20,037 | 88.6% | 4.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out