TransPennine Express at Penrith (North Lakes)
All trains at Penrith (North Lakes)TransPennine Express across BritainNorth West
How this operator is doing here
TransPennine Express had 11,765 scheduled stops at Penrith (North Lakes) in the 13 periods to Period 7 of 2026-27, 53% of the station's total. 56.3% of recorded arrivals came within three minutes and 4.4% of stops were cancelled.
TransPennine Express trains at Penrith (North Lakes) also serve Carlisle (27.7 km north-west, 63.5% on time, 4.3% cancelled), Oxenholme Lake District (39.7 km south, 48.2% on time, 4.3% cancelled), Lockerbie (63.8 km north-west, 57.2% on time, 4.8% cancelled), Lancaster (68.3 km south, 52.7% on time, 4.1% cancelled), Durham (76.7 km east, 73.4% on time, 3.3% cancelled) and Chester-le-Street (78.7 km east, 67.8% on time, 3.3% cancelled), which are the stations on its network closest to Penrith (North Lakes).
The busiest TransPennine Express station within 30 km of Penrith (North Lakes) is Carlisle, 27.7 km north-west, with about 33 scheduled stops a day.
Of the 2 operators with enough records at Penrith (North Lakes), TransPennine Express is the most punctual, at 56.3%.
For TransPennine Express, Penrith (North Lakes) is the 72nd best of 77 ranked stations. Its 56.3% here is 12.5 percentage points below the 68.8% across the whole network.
Over three full railway years TransPennine Express at Penrith (North Lakes) has got worse each time, from 58.8% within three minutes in 2023-24 to 56.1% in 2024-25 and 55.9% in 2025-26.
Period by period
See how TransPennine Express Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 958 | 54.7% | 2.9% |
| Period 6 of 2026-27 | 965 | 58.6% | 2.2% |
| Period 5 of 2026-27 | 967 | 56.0% | 3.9% |
| Period 4 of 2026-27 | 967 | 53.1% | 4.2% |
| Period 3 of 2026-27 | 957 | 55.9% | 2.9% |
| Period 2 of 2026-27 | 956 | 59.1% | 3.0% |
| Period 1 of 2026-27 | 936 | 65.6% | 2.6% |
| Period 13 of 2025-26 | 922 | 64.0% | 4.8% |
| Period 12 of 2025-26 | 971 | 62.1% | 6.6% |
| Period 11 of 2025-26 | 562 | 60.2% | 1.2% |
| Period 10 of 2025-26 | 727 | 48.4% | 6.5% |
| Period 9 of 2025-26 | 953 | 43.2% | 6.4% |
| Period 8 of 2025-26 | 924 | 49.9% | 9.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Penrith (North Lakes)
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Avanti | 10,644 | 46.3% | 4.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out