Parton
PRNNorth WestManaged by Northern Trains
How this station is performing
Parton has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 12,832 scheduled stops, about 35 a day. In those periods 92.3% of stops arrived within three minutes of the timetable and 2.7% of scheduled stops were cancelled.
Parton opened on 19 March 1847, 179 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Harrington is the oldest (1846) and Corkickle the newest (1855), with Parton in between.
The nearest stations to Parton are Whitehaven (2.0 km south), Corkickle (3.2 km south), Harrington (4.9 km north), Workington (8.4 km north) and St Bees (8.7 km south). 5 stations lie within 10 km in all. Of the five, Harrington is the most punctual at 94.1% and St Bees the least at 73.2%, with Parton on 92.3%.
Parton is one of 3 stations named after a Village called Parton, home to about 924 people; this one stands 0.1 km from its centre.
1 of 3 stations of a similar size in North West are more punctual than Parton on 92.3%. The comparison group includes Whitehaven (90.9%), Patricroft (60.4%) and Flimby (92.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 12,832 | 92.3% | 2.7% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 984 | 93.5% | 3.4% |
| Period 6 of 2026-27 | 984 | 93.5% | 1.3% |
| Period 5 of 2026-27 | 984 | 94.9% | 1.3% |
| Period 4 of 2026-27 | 984 | 94.0% | 0.5% |
| Period 3 of 2026-27 | 984 | 92.8% | 0.7% |
| Period 2 of 2026-27 | 984 | 91.8% | 2.2% |
| Period 1 of 2026-27 | 1,133 | – | 2.2% |
| Period 13 of 2025-26 | 1,080 | 90.6% | 4.0% |
| Period 12 of 2025-26 | 984 | 91.5% | 1.6% |
| Period 11 of 2025-26 | 938 | 94.5% | 2.2% |
| Period 10 of 2025-26 | 837 | 90.6% | 5.7% |
| Period 9 of 2025-26 | 972 | 89.0% | 6.5% |
| Period 8 of 2025-26 | 984 | 90.7% | 4.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Whitehaven | 12,832 | 90.9% | 2.7% |
| Patricroft | 12,848 | 60.4% | 2.5% |
| Flimby | 12,884 | 92.7% | 2.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out