How this operator is doing here
East Midlands Railway had 1,256 scheduled stops at Oakham in the 13 periods to Period 7 of 2026-27, 10% of the station's total. 80.4% of recorded arrivals came within three minutes and 12.2% of stops were cancelled.
East Midlands Railway trains at Oakham also serve Melton Mowbray (14.2 km north-west, 81.4% on time, 12.2% cancelled), Stamford (Lincs) (17.3 km east, – on time, 3.5% cancelled), Corby (20.6 km south, 83.8% on time, 8.1% cancelled), Syston (23.6 km west, 82.5% on time, 3.8% cancelled), Market Harborough (24.4 km south-west, 59.5% on time, 4.9% cancelled) and Sileby (26.1 km west, 82.2% on time, 3.6% cancelled), which are the stations on its network closest to Oakham.
Within 30 km of here, East Midlands Railway runs best at Barrow-upon-Soar, 29.0 km west (84.8%), and worst at Market Harborough, 24.4 km south-west (59.5%).
The busiest East Midlands Railway station within 30 km of Oakham is Leicester, 26.7 km west, with about 154 scheduled stops a day.
East Midlands Railway at Oakham has edged up: 80.4% of stops came within three minutes of the timetable in the latest 13 periods, 4.1 percentage points better than the 76.3% of the 13 before. Cancellations rose to 12.2% of scheduled stops from 4.3%, which is 7.9 percentage points more.
Period by period
See how East Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 66 | 80.0% | 1.5% |
| Period 6 of 2026-27 | 68 | 76.7% | 5.9% |
| Period 5 of 2026-27 | 68 | 85.5% | 8.8% |
| Period 4 of 2026-27 | 80 | 83.3% | 13.8% |
| Period 3 of 2026-27 | 97 | 77.6% | 21.6% |
| Period 2 of 2026-27 | 107 | 82.1% | 19.6% |
| Period 1 of 2026-27 | 125 | 84.3% | 11.2% |
| Period 13 of 2025-26 | 118 | 85.1% | 22.0% |
| Period 12 of 2025-26 | 108 | 79.8% | 15.7% |
| Period 11 of 2025-26 | 108 | 75.8% | 10.2% |
| Period 10 of 2025-26 | 97 | 83.7% | 3.1% |
| Period 9 of 2025-26 | 106 | 73.3% | 8.5% |
| Period 8 of 2025-26 | 108 | 78.8% | 8.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Oakham
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 11,454 | 59.0% | 3.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out