Norwich
NRWEast of EnglandManaged by Greater Anglia
How this station is performing
Norwich had 86,247 scheduled stops to Period 7 of 2026-27, about 237 a day. 88.5% of recorded arrivals were within three minutes of the timetable and 1.3% of scheduled stops were cancelled.
Norwich opened on 1 May 1844. It was moved to the site it uses now on 3 May 1886. Of the 5 stations nearest to it with a known opening date, Norwich is the oldest; the next oldest, Brundall, dates from 1844.
The nearest stations to Norwich are Brundall Gardens (7.5 km east), Salhouse (7.9 km north-east), Brundall (8.9 km east), Buckenham (11.4 km east) and Hoveton and Wroxham (12.0 km north-east). 3 stations lie within 10 km in all. At 88.5%, Norwich is less punctual than all of them; the best of the five, Brundall Gardens, manages 96.6%.
Norwich takes its name from a big city called Norwich, home to about 195,971 people, and the station stands 1.0 km from its centre.
2 operators call at Norwich: Greater Anglia (92.4%, 89% of stops) and East Midlands Railway (54.8%, 11% of stops). The operator you travel with matters: Greater Anglia reaches 92.4% within three minutes while East Midlands Railway manages 54.8%, a gap of 37.6 percentage points.
2 of 3 stations of a similar size in East of England are more punctual than Norwich on 88.5%. The comparison group includes Colchester (92.9%), Bishops Stortford (89.4%) and Bedford (83.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 76,917 | 92.4% | 0.7% |
| East Midlands Railway | 9,330 | 54.8% | 5.8% |
Operators with their own page for this station are linked to it.
Late train at Norwich? Delay Repay
These operators call at Norwich and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 6,367 | 85.3% | 0.7% |
| Period 6 of 2026-27 | 6,635 | 82.7% | 1.7% |
| Period 5 of 2026-27 | 6,816 | 86.5% | 2.0% |
| Period 4 of 2026-27 | 6,761 | 86.2% | 1.4% |
| Period 3 of 2026-27 | 6,719 | 87.4% | 1.9% |
| Period 2 of 2026-27 | 6,541 | 89.4% | 1.3% |
| Period 1 of 2026-27 | 7,276 | 90.1% | 0.9% |
| Period 13 of 2025-26 | 7,248 | 90.0% | 1.4% |
| Period 12 of 2025-26 | 6,583 | 92.1% | 0.9% |
| Period 11 of 2025-26 | 6,555 | 91.5% | 0.9% |
| Period 10 of 2025-26 | 6,002 | 89.6% | 1.2% |
| Period 9 of 2025-26 | 6,349 | 89.5% | 1.2% |
| Period 8 of 2025-26 | 6,395 | 90.3% | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Colchester | 89,373 | 92.9% | 1.2% |
| Bishops Stortford | 82,015 | 89.4% | 2.4% |
| Bedford | 92,548 | 83.4% | 5.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out