Newton St Cyres
NTCSouth WestManaged by Great Western Railway
How this station is performing
Newton St Cyres has usable figures for 6 of the last 13 four-week periods to Period 7 of 2026-27, covering 6,409 scheduled stops, about 18 a day. In those periods 67.1% of stops arrived within three minutes of the timetable and 3.6% of scheduled stops were cancelled.
Newton St Cyres opened on 12 May 1851, 175 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Exeter St David's is the oldest (1844) and St James Park (Exeter) the newest (1906), with Newton St Cyres in between.
The nearest stations to Newton St Cyres are Crediton (4.1 km west), Exeter St David's (6.4 km south-east), Exeter Central (7.0 km south-east), St James Park (Exeter) (7.0 km south-east) and Exeter St Thomas (7.7 km south-east). 9 stations lie within 10 km in all. At 67.1%, Newton St Cyres is less punctual than all of them; the best of the five, St James Park (Exeter), manages 82.7%.
Newton St Cyres takes its name from a Village called Newton St Cyres, home to about 969 people, and the station stands 1.2 km from its centre.
For Newton St Cyres, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 53.4% of stops arrived within three minutes of the timetable. The strongest was Period 3 of 2024-25, at 81.5%, which is 28.1 percentage points higher. Cancellations peaked at 14.3% of scheduled stops in Period 9 of 2024-25, against 3.6% over the latest 13 periods.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 6,409 | 67.1% | 3.6% |
Operators with their own page for this station are linked to it.
Late train at Newton St Cyres? Delay Repay
These operators call at Newton St Cyres and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 525 | 72.3% | 1.7% |
| Period 6 of 2026-27 | 525 | 53.4% | 1.7% |
| Period 5 of 2026-27 | 519 | – | 3.7% |
| Period 4 of 2026-27 | 525 | – | 5.9% |
| Period 3 of 2026-27 | 526 | 69.6% | 4.4% |
| Period 2 of 2026-27 | 530 | 69.4% | 3.8% |
| Period 1 of 2026-27 | 609 | 77.3% | 1.1% |
| Period 13 of 2025-26 | 411 | – | 0.5% |
| Period 12 of 2025-26 | 291 | – | 0.7% |
| Period 11 of 2025-26 | 450 | – | 8.2% |
| Period 10 of 2025-26 | 482 | – | 1.0% |
| Period 9 of 2025-26 | 491 | – | 7.7% |
| Period 8 of 2025-26 | 525 | 58.6% | 6.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out