Newton For Hyde
NWNNorth WestManaged by Northern Trains
How this station is performing
Newton For Hyde had 23,022 scheduled stops to Period 7 of 2026-27, about 63 a day. 87.4% of recorded arrivals were within three minutes of the timetable and 2.1% of scheduled stops were cancelled.
Newton For Hyde opened on 17 November 1841, 185 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Newton For Hyde is the oldest; the next oldest, Hyde Central, dates from 1858.
The nearest stations to Newton For Hyde are Godley (0.9 km south-east), Flowery Field (1.0 km north-west), Hyde Central (1.3 km south-west), Hyde North (1.4 km north-west) and Hattersley (2.3 km south-east). 37 stations lie within 10 km in all. Of the five, Hyde North is the most punctual at 91.6% and Hattersley the least at 86.0%, with Newton For Hyde on 87.4%.
Newton For Hyde is named after Newton, a Village, but the station stands 1.5 km from its centre.
Across the whole run of data, the weakest four-week period for Newton For Hyde was Period 9 of 2023-24, at 68.1%, some time before the latest year. The strongest was Period 13 of 2023-24, at 91.8%, and the two are 23.7 percentage points apart. Cancellations peaked at 6.3% of scheduled stops in Period 8 of 2024-25, against 2.1% over the latest 13 periods.
1 of 3 stations of a similar size in North West are more punctual than Newton For Hyde on 87.4%. The comparison group includes Broadbottom (85.4%), Flowery Field (87.8%) and Godley (87.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 23,022 | 87.4% | 2.1% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,812 | 90.4% | 1.2% |
| Period 6 of 2026-27 | 1,808 | 90.0% | 1.5% |
| Period 5 of 2026-27 | 1,580 | 88.4% | 0.6% |
| Period 4 of 2026-27 | 1,789 | 85.6% | 2.8% |
| Period 3 of 2026-27 | 1,716 | 88.0% | 0.8% |
| Period 2 of 2026-27 | 1,799 | 88.0% | 1.7% |
| Period 1 of 2026-27 | 2,076 | 90.0% | 5.0% |
| Period 13 of 2025-26 | 1,978 | 88.9% | 0.9% |
| Period 12 of 2025-26 | 1,488 | 91.5% | 1.5% |
| Period 11 of 2025-26 | 1,718 | 91.4% | 1.1% |
| Period 10 of 2025-26 | 1,645 | 86.5% | 4.0% |
| Period 9 of 2025-26 | 1,801 | 76.9% | 3.3% |
| Period 8 of 2025-26 | 1,812 | 81.2% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Broadbottom | 23,022 | 85.4% | 2.1% |
| Flowery Field | 23,022 | 87.8% | 2.1% |
| Godley | 23,022 | 87.3% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out