Newport (Essex)
NWEEast of EnglandManaged by Greater Anglia
How this station is performing
Newport (Essex) had 18,277 scheduled stops to Period 7 of 2026-27, about 50 a day. 87.0% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Newport (Essex) opened on 30 July 1845, 181 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Newport (Essex) is the oldest; the next oldest, Audley End, dates from 1845.
The nearest stations to Newport (Essex) are Audley End (2.8 km north), Elsenham (Essex) (6.7 km south), Stansted Mountfitchet (8.8 km south), Great Chesterford (9.0 km north) and Stansted Airport (10.6 km south). 4 stations lie within 10 km in all. Of the five, Stansted Mountfitchet is the most punctual at 87.9% and Great Chesterford the least at 86.1%, with Newport (Essex) on 87.0%.
Newport (Essex) is named after Newport, a Village, home to about 2,936 people, but the station stands 0.3 km from its centre.
Newport (Essex) has slipped a little, from 91.4% within three minutes in the previous 13 periods to 87.0% in the latest 13, a fall of 4.4 percentage points. Cancellations held steady at 1.8% of scheduled stops, against 1.8% before.
2 of 3 stations of a similar size in East of England are more punctual than Newport (Essex) on 87.0%. The comparison group includes Elsenham (Essex) (87.4%), Hatfield Peverel (89.1%) and Great Chesterford (86.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 18,277 | 87.0% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at Newport (Essex)? Delay Repay
These operators call at Newport (Essex) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,430 | 82.5% | 2.6% |
| Period 6 of 2026-27 | 1,429 | 84.6% | 1.6% |
| Period 5 of 2026-27 | 1,435 | 78.4% | 4.9% |
| Period 4 of 2026-27 | 1,444 | 84.1% | 2.3% |
| Period 3 of 2026-27 | 1,444 | 84.9% | 1.5% |
| Period 2 of 2026-27 | 1,423 | 90.2% | 0.9% |
| Period 1 of 2026-27 | 1,608 | 90.9% | 1.7% |
| Period 13 of 2025-26 | 1,554 | 90.1% | 0.7% |
| Period 12 of 2025-26 | 1,403 | 89.6% | 1.8% |
| Period 11 of 2025-26 | 1,411 | 89.5% | 1.1% |
| Period 10 of 2025-26 | 903 | 89.2% | 1.2% |
| Period 9 of 2025-26 | 1,394 | 86.3% | 0.9% |
| Period 8 of 2025-26 | 1,399 | 91.0% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Elsenham (Essex) | 18,277 | 87.4% | 1.8% |
| Hatfield Peverel | 18,035 | 89.1% | 1.0% |
| Great Chesterford | 18,004 | 86.1% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out