Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Newmarket

NMKEast of EnglandManaged by Greater Anglia

On time, last 13 periods89.9%Great Britain: 83.6%
Cancelled1.9%Great Britain: 3.2%
Stops a day32Scheduled, on average
Punctuality rank535th of 2,374Among ranked stations

How this station is performing

Newmarket had 11,810 scheduled stops to Period 7 of 2026-27, about 32 a day. 89.9% of recorded arrivals were within three minutes of the timetable and 1.9% of scheduled stops were cancelled.

Newmarket opened on 4 April 1848. It was moved to the site it uses now on 7 April 1902. Among the 5 stations nearest to it with a known opening date, Waterbeach is the oldest (1845) and Cambridge North the newest (2017), with Newmarket in between.

The nearest stations to Newmarket are Dullingham (5.0 km south-west), Kennett (7.1 km north-east), Soham (12.0 km north-west), Waterbeach (14.6 km west) and Cambridge North (17.0 km west). 2 stations lie within 10 km in all. At 89.9%, Newmarket is more punctual than every one of them; the best of the five, Kennett, manages 89.8%.

Newmarket is one of 3 stations named after a market town called Newmarket, home to about 20,384 people; this one stands 0.9 km from its centre.

For Newmarket, the weakest four-week period in the data is a recent one: Period 4 of 2026-27, when only 69.3% of stops arrived within three minutes of the timetable. The strongest was Period 13 of 2024-25, at 96.9%, which is 27.6 percentage points higher. Cancellations peaked at 6.4% of scheduled stops in Period 8 of 2023-24, against 1.9% over the latest 13 periods.

Compared with 3 stations of a similar size in East of England, Newmarket is the least punctual, at 89.9%. All of them are ahead, including Brampton (Suffolk) (93.9%), Halesworth (95.5%) and Beccles (94.8%).

Period by period

70%80%90%100%2023-242024-252025-262026-27Period 5 of 2024-25: 96.5%Period 6 of 2024-25: 96.9%Period 7 of 2024-25: 93.3%Period 8 of 2024-25: 96.2%Period 9 of 2024-25: 92.4%Period 10 of 2024-25: 95.9%Period 11 of 2024-25: 95.0%Period 12 of 2024-25: 94.8%Period 13 of 2024-25: 96.9%Period 1 of 2025-26: 95.5%Period 2 of 2025-26: 95.3%Period 3 of 2025-26: 94.2%Period 4 of 2025-26: 91.6%Period 5 of 2025-26: 96.6%Period 6 of 2025-26: 88.9%Period 7 of 2025-26: 93.0%Period 8 of 2025-26: 93.7%Period 9 of 2025-26: 95.6%Period 10 of 2025-26: 90.5%Period 11 of 2025-26: 88.4%Period 12 of 2025-26: 94.9%Period 13 of 2025-26: 93.3%Period 1 of 2026-27: 94.2%Period 2 of 2026-27: 88.5%Period 3 of 2026-27: 84.0%Period 4 of 2026-27: 69.3%Period 5 of 2026-27: 87.9%Period 6 of 2026-27: 92.6%Period 7 of 2026-27: 92.1%
This pageGreat Britain
0%2%4%6%8%Period 1 of 2023-24: 0.5%Period 2 of 2023-24: 1.1%Period 3 of 2023-24: 1.3%Period 4 of 2023-24: 2.1%Period 5 of 2023-24: 0.1%Period 6 of 2023-24: 1.4%Period 7 of 2023-24: 0.8%Period 8 of 2023-24: 6.4%Period 9 of 2023-24: 1.5%Period 10 of 2023-24: 1.8%Period 11 of 2023-24: 1.6%Period 12 of 2023-24: 2.7%Period 13 of 2023-24: 0.9%Period 1 of 2024-25: 3.6%Period 2 of 2024-25: 1.3%Period 3 of 2024-25: 0.0%Period 4 of 2024-25: 3.1%Period 5 of 2024-25: 2.3%Period 6 of 2024-25: 0.7%Period 7 of 2024-25: 1.0%Period 8 of 2024-25: 0.8%Period 9 of 2024-25: 1.2%Period 10 of 2024-25: 1.0%Period 11 of 2024-25: 0.4%Period 12 of 2024-25: 0.8%Period 13 of 2024-25: 0.5%Period 1 of 2025-26: 0.3%Period 2 of 2025-26: 2.3%Period 3 of 2025-26: 1.2%Period 4 of 2025-26: 1.0%Period 5 of 2025-26: 0.5%Period 6 of 2025-26: 1.1%Period 7 of 2025-26: 0.6%Period 8 of 2025-26: 1.2%Period 9 of 2025-26: 0.6%Period 10 of 2025-26: 1.2%Period 11 of 2025-26: 1.9%Period 12 of 2025-26: 1.4%Period 13 of 2025-26: 0.7%Period 1 of 2026-27: 2.2%Period 2 of 2026-27: 1.6%Period 3 of 2026-27: 4.3%Period 4 of 2026-27: 5.8%Period 5 of 2026-27: 0.9%Period 6 of 2026-27: 1.3%Period 7 of 2026-27: 1.1%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Greater Anglia11,81089.9%1.9%

Operators with their own page for this station are linked to it.

Late train at Newmarket? Delay Repay

These operators call at Newmarket and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2798292.1%1.1%
Period 6 of 2026-2797192.6%1.3%
Period 5 of 2026-2799087.9%0.9%
Period 4 of 2026-2790469.3%5.8%
Period 3 of 2026-2787784.0%4.3%
Period 2 of 2026-2795388.5%1.6%
Period 1 of 2026-2793694.2%2.2%
Period 13 of 2025-2693493.3%0.7%
Period 12 of 2025-2692394.9%1.4%
Period 11 of 2025-2689788.4%1.9%
Period 10 of 2025-2658990.5%1.2%
Period 9 of 2025-2692595.6%0.6%
Period 8 of 2025-2692993.7%1.2%

Time of year

80%90%100%P1: 94.8%1P2: 91.7%2P3: 89.5%3P4: 81.3%4P5: 93.6%5P6: 92.8%6P7: 92.8%7P8: 94.9%8P9: 94.0%9P10: 93.3%10P11: 91.7%11P12: 94.8%12P13: 95.2%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in East of England

StationScheduled stopsWithin 3 minCancelled
Brampton (Suffolk)11,68593.9%0.6%
Halesworth11,68595.5%0.6%
Beccles11,94794.8%0.7%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out