Millom
MLMNorth WestManaged by Northern Trains
How this station is performing
Millom had 8,743 scheduled stops to Period 7 of 2026-27, about 24 a day. 79.7% of recorded arrivals were within three minutes of the timetable and 4.8% of scheduled stops were cancelled.
Millom opened on 1 November 1850, 176 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Kirkby-in-Furness is the oldest (1846) and Foxfield the newest (1858), with Millom in between.
The nearest stations to Millom are Green Road (4.1 km north-east), Silecroft (4.4 km west), Askam (5.0 km south-east), Kirkby-in-Furness (6.0 km north-east) and Foxfield (6.4 km north-east). 6 stations lie within 10 km in all. Of the five, Askam is the most punctual at 81.7% and Silecroft the least at 74.0%, with Millom on 79.7%.
Millom takes its name from a town called Millom, home to about 7,829 people, and the station stands 0.2 km from its centre.
Millom has edged up: 79.7% of stops came within three minutes of the timetable in the latest 13 periods, 4.0 percentage points better than the 75.7% of the 13 before. Cancellations fell to 4.8% of scheduled stops from 5.5%, which is 0.7 percentage points fewer.
Compared with 3 stations of a similar size in North West, Millom is the least punctual, at 79.7%. All of them are ahead, including Askam (81.7%), Orrell (86.9%) and Pemberton (82.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 8,743 | 79.7% | 4.8% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 668 | 76.7% | 2.8% |
| Period 6 of 2026-27 | 668 | 84.1% | 6.0% |
| Period 5 of 2026-27 | 668 | 80.7% | 3.1% |
| Period 4 of 2026-27 | 668 | 75.8% | 4.6% |
| Period 3 of 2026-27 | 668 | 79.4% | 4.0% |
| Period 2 of 2026-27 | 668 | 80.7% | 2.2% |
| Period 1 of 2026-27 | 766 | 84.4% | 0.7% |
| Period 13 of 2025-26 | 735 | 83.1% | 4.4% |
| Period 12 of 2025-26 | 669 | 80.7% | 3.9% |
| Period 11 of 2025-26 | 667 | 83.3% | 4.9% |
| Period 10 of 2025-26 | 562 | 83.0% | 14.1% |
| Period 9 of 2025-26 | 668 | 75.3% | 7.2% |
| Period 8 of 2025-26 | 668 | 67.8% | 6.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out