Maryport
MRYNorth WestManaged by Northern Trains
How this station is performing
Maryport had 13,247 scheduled stops to Period 7 of 2026-27, about 36 a day. 94.4% of recorded arrivals were within three minutes of the timetable and 2.9% of scheduled stops were cancelled.
Maryport opened on 15 July 1840. It was moved to the site it uses now on 4 June 1860. Of the 5 stations nearest to it with a known opening date, Maryport is the oldest; the next oldest, Aspatria, dates from 1841.
The nearest stations to Maryport are Flimby (2.9 km south-west), Workington (8.5 km south-west), Aspatria (11.7 km north-east), Harrington (11.8 km south-west) and Parton (16.6 km south). 2 stations lie within 10 km in all. Of the five, Aspatria is the most punctual at 94.6% and Parton the least at 92.3%, with Maryport on 94.4%.
Maryport takes its name from a town called Maryport, home to about 11,275 people, and the station stands 0.2 km from its centre.
Maryport improved sharply over the past year. In the latest 13 periods 94.4% of stops came within three minutes of the timetable, up 15.8 percentage points from 78.6% in the 13 before. Cancellations fell to 2.9% of scheduled stops from 4.5%, which is 1.6 percentage points fewer.
Compared with 3 stations of a similar size in North West, Maryport is the most punctual, at 94.4%. The comparison group includes Workington (93.0%), Heswall (75.6%) and Neston (76.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 13,247 | 94.4% | 2.9% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,016 | 96.2% | 2.6% |
| Period 6 of 2026-27 | 1,016 | 94.8% | 1.3% |
| Period 5 of 2026-27 | 1,016 | 95.0% | 1.4% |
| Period 4 of 2026-27 | 1,016 | 96.1% | 0.6% |
| Period 3 of 2026-27 | 1,016 | 95.5% | 0.7% |
| Period 2 of 2026-27 | 1,016 | 93.4% | 2.4% |
| Period 1 of 2026-27 | 1,169 | 94.1% | 2.2% |
| Period 13 of 2025-26 | 1,116 | 92.8% | 4.0% |
| Period 12 of 2025-26 | 1,013 | 94.5% | 1.6% |
| Period 11 of 2025-26 | 965 | 96.2% | 1.8% |
| Period 10 of 2025-26 | 865 | 94.8% | 7.1% |
| Period 9 of 2025-26 | 1,007 | 92.5% | 7.3% |
| Period 8 of 2025-26 | 1,016 | 91.4% | 5.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Workington | 13,264 | 93.0% | 2.7% |
| Heswall | 13,328 | 75.6% | 4.0% |
| Neston | 13,328 | 76.1% | 4.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out