Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Great Western Railway at Manorbier

All trains at ManorbierGreat Western Railway across BritainWales

On time, last 13 periods–Whole station: 76.6%
Cancelled–Whole station: 4.1%
Scheduled stops68Of 5,962 at the station

How this operator is doing here

There are not enough usable records of Great Western Railway at Manorbier to report how punctual it is.

Period by period

75%80%85%90%2023-242024-252025-262026-27
This pageGreat Britain
0%2%4%2023-242024-252025-262026-27

See how Great Western Railway Delay Repay works

The last 13 periods

Other operators at Manorbier

OperatorScheduled stopsWithin 3 minCancelled
Transport for Wales5,89476.6%4.0%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out