Greater Anglia at Manea
All trains at ManeaGreater Anglia across BritainEast of England
How this operator is doing here
Greater Anglia had 5,293 scheduled stops at Manea in the 13 periods to Period 7 of 2026-27, 70% of the station's total. 67.3% of recorded arrivals came within three minutes and 2.0% of stops were cancelled.
Greater Anglia trains at Manea also serve March (9.1 km north-west, 70.2% on time, 2.0% cancelled), Ely (13.3 km south-east, 79.1% on time, 1.9% cancelled), Shippea Hill (17.6 km south-east, – on time, – cancelled), Soham (20.8 km south-east, 66.8% on time, 0.8% cancelled), Whittlesea (20.8 km west, 67.1% on time, 2.0% cancelled) and Lakenheath (24.8 km east, – on time, – cancelled), which are the stations on its network closest to Manea.
Within 30 km of here, Greater Anglia runs best at Ely, 13.3 km south-east (79.1%), and worst at Soham, 20.8 km south-east (66.8%).
The busiest Greater Anglia station within 30 km of Manea is Ely, 13.3 km south-east, with about 57 scheduled stops a day.
Of the 2 operators with enough records at Manea, Greater Anglia is the most punctual, at 67.3%.
Greater Anglia at Manea has slipped sharply. 67.3% of stops came within three minutes of the timetable in the latest 13 periods, 9.5 percentage points worse than the 76.8% recorded in the 13 before. Cancellations held steady at 2.0% of scheduled stops, against 1.6% before.
Period by period
See how Greater Anglia Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 382 | 51.1% | 2.6% |
| Period 6 of 2026-27 | 432 | 36.3% | 4.6% |
| Period 5 of 2026-27 | 432 | 58.8% | 2.8% |
| Period 4 of 2026-27 | 420 | 73.9% | 2.4% |
| Period 3 of 2026-27 | 381 | 67.6% | 1.8% |
| Period 2 of 2026-27 | 348 | 73.8% | 2.3% |
| Period 1 of 2026-27 | 446 | 84.3% | 1.8% |
| Period 13 of 2025-26 | 466 | 84.9% | 0.9% |
| Period 12 of 2025-26 | 424 | 80.5% | 2.8% |
| Period 11 of 2025-26 | 424 | 82.4% | 0.9% |
| Period 10 of 2025-26 | 388 | 66.9% | 0.5% |
| Period 9 of 2025-26 | 414 | 56.2% | 1.0% |
| Period 8 of 2025-26 | 336 | 51.1% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Manea
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 2,256 | 61.9% | 3.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out