TransPennine Express at Manchester Victoria
All trains at Manchester VictoriaTransPennine Express across BritainNorth West
How this operator is doing here
TransPennine Express had 45,343 scheduled stops at Manchester Victoria in the 13 periods to Period 7 of 2026-27, 34% of the station's total. 69.2% of recorded arrivals came within three minutes and 2.8% of stops were cancelled.
TransPennine Express trains at Manchester Victoria also serve Manchester Piccadilly (1.4 km south-east, 65.8% on time, 3.5% cancelled), Manchester Oxford Road (1.6 km south, 53.6% on time, 3.9% cancelled), Deansgate (1.6 km south, – on time, – cancelled), Salford Crescent (2.2 km west, – on time, – cancelled), Urmston (8.6 km south-west, 54.1% on time, 7.4% cancelled) and Guide Bridge (8.7 km east, – on time, – cancelled), which are the stations on its network closest to Manchester Victoria.
Within 30 km of here, TransPennine Express runs best at Manchester Airport, 13.8 km south (77.8%), and worst at Manchester Oxford Road, 1.6 km south (53.6%).
The busiest TransPennine Express station within 30 km of Manchester Victoria is Manchester Piccadilly, 1.4 km south-east, with about 152 scheduled stops a day.
Of the 2 operators with enough records at Manchester Victoria, TransPennine Express is the least punctual, at 69.2%.
For TransPennine Express, Manchester Victoria ranks 40th of 77 stations and is typical: 69.2% here against 68.8% across the network, a difference of 0.4 percentage points.
Period by period
See how TransPennine Express Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,485 | 69.5% | 2.4% |
| Period 6 of 2026-27 | 3,686 | 70.9% | 2.1% |
| Period 5 of 2026-27 | 3,135 | 71.1% | 6.5% |
| Period 4 of 2026-27 | 3,294 | 69.9% | 2.7% |
| Period 3 of 2026-27 | 3,055 | 75.1% | 3.9% |
| Period 2 of 2026-27 | 3,396 | 70.0% | 2.3% |
| Period 1 of 2026-27 | 4,339 | 72.7% | 1.9% |
| Period 13 of 2025-26 | 4,072 | 74.2% | 1.5% |
| Period 12 of 2025-26 | 4,064 | 73.2% | 0.9% |
| Period 11 of 2025-26 | 3,202 | 67.4% | 4.7% |
| Period 10 of 2025-26 | 3,215 | 67.5% | 2.2% |
| Period 9 of 2025-26 | 3,467 | 52.3% | 2.9% |
| Period 8 of 2025-26 | 2,933 | 63.0% | 3.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Manchester Victoria
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 89,760 | 74.1% | 2.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out