Lympstone Commando
LYCSouth WestManaged by Great Western Railway
How this station is performing
Lympstone Commando has usable figures for 6 of the last 13 four-week periods to Period 7 of 2026-27, covering 18,762 scheduled stops, about 52 a day. In those periods 74.0% of stops arrived within three minutes of the timetable and 3.5% of scheduled stops were cancelled.
Lympstone Commando opened on 3 May 1976, 50 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Lympstone Commando is the newest; the oldest, Starcross, opened in 1846.
The nearest stations to Lympstone Commando are Exton (0.6 km north), Lympstone Village (1.7 km south-east), Topsham (3.1 km north-west), Starcross (3.9 km south) and Exmouth (4.9 km south). 16 stations lie within 10 km in all. Of the five, Lympstone Village is the most punctual at 85.2% and Exton the least at 72.8%, with Lympstone Commando on 74.0%.
Lympstone Commando is named after Lympstone, a Village, home to about 2,120 people, but the station stands 2.0 km from its centre.
For Lympstone Commando, the weakest four-week period in the data is a recent one: Period 2 of 2026-27, when only 64.9% of stops arrived within three minutes of the timetable. The strongest was Period 12 of 2023-24, at 90.9%, which is 26.0 percentage points higher. Cancellations peaked at 7.2% of scheduled stops in Period 4 of 2026-27, against 3.5% over the latest 13 periods.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 18,762 | 74.0% | 3.5% |
Operators with their own page for this station are linked to it.
Late train at Lympstone Commando? Delay Repay
These operators call at Lympstone Commando and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,452 | 80.4% | 3.3% |
| Period 6 of 2026-27 | 1,446 | – | 2.9% |
| Period 5 of 2026-27 | 1,442 | – | 4.1% |
| Period 4 of 2026-27 | 1,410 | 67.4% | 7.2% |
| Period 3 of 2026-27 | 1,446 | 72.2% | 3.9% |
| Period 2 of 2026-27 | 1,446 | 64.9% | 3.7% |
| Period 1 of 2026-27 | 1,678 | – | 2.0% |
| Period 13 of 2025-26 | 1,583 | 76.5% | 2.8% |
| Period 12 of 2025-26 | 1,295 | 86.1% | 1.9% |
| Period 11 of 2025-26 | 1,443 | – | 2.1% |
| Period 10 of 2025-26 | 1,323 | – | 6.0% |
| Period 9 of 2025-26 | 1,444 | – | 2.9% |
| Period 8 of 2025-26 | 1,354 | – | 3.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out