Luxulyan
LUXSouth WestManaged by Great Western Railway
How this station is performing
Luxulyan has usable figures for 1 of the last 13 four-week periods to Period 7 of 2026-27, covering 5,223 scheduled stops, about 14 a day. In those periods 61.1% of stops arrived within three minutes of the timetable and 7.0% of scheduled stops were cancelled.
Luxulyan opened on 20 June 1876, 150 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Luxulyan is the newest; the oldest, Par, opened in 1859.
The nearest stations to Luxulyan are Bugle (3.3 km west), Par (4.9 km south-east), Lostwithiel (6.1 km east), St Austell (6.3 km south-west) and Roche (6.6 km north-west). 6 stations lie within 10 km in all. At 61.1%, Luxulyan is less punctual than all of them; the best of the five, Roche, manages 73.7%.
Luxulyan takes its name from a Village called Luxulyan, home to about 1,486 people, and the station stands 0.3 km from its centre.
Great Western Railway is the only operator serving Luxulyan. Here it manages 61.1% within three minutes, 14.6 percentage points worse than its 75.7% across its whole network.
Luxulyan is a quiet station, ranked 2476th for entries and exits in 2025-26, with about 3,898 of them. That is roughly 1 passengers for every scheduled stop.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 5,223 | 61.1% | 7.0% |
Operators with their own page for this station are linked to it.
Late train at Luxulyan? Delay Repay
These operators call at Luxulyan and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 452 | – | 2.9% |
| Period 6 of 2026-27 | 447 | – | 3.4% |
| Period 5 of 2026-27 | 458 | – | 6.1% |
| Period 4 of 2026-27 | 448 | – | 11.4% |
| Period 3 of 2026-27 | 445 | – | 9.4% |
| Period 2 of 2026-27 | 428 | – | 3.7% |
| Period 1 of 2026-27 | 472 | 61.1% | 1.5% |
| Period 13 of 2025-26 | 446 | – | 1.3% |
| Period 12 of 2025-26 | 408 | – | 7.4% |
| Period 11 of 2025-26 | 269 | – | 28.3% |
| Period 10 of 2025-26 | 361 | – | 18.3% |
| Period 9 of 2025-26 | 281 | – | 3.9% |
| Period 8 of 2025-26 | 308 | – | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out