East Midlands Railway at Longport
All trains at LongportEast Midlands Railway across BritainWest Midlands
How this operator is doing here
East Midlands Railway had 746 scheduled stops at Longport in the 13 periods to Period 7 of 2026-27, 5% of the station's total. 67.2% of recorded arrivals came within three minutes and 2.8% of stops were cancelled.
East Midlands Railway trains at Longport also serve Stoke-on-Trent (4.5 km south-east, 71.2% on time, 2.8% cancelled), Kidsgrove (5.3 km north, 70.9% on time, 3.3% cancelled), Longton (7.9 km south-east, 68.6% on time, 2.5% cancelled), Alsager (7.9 km north-west, 78.5% on time, 3.3% cancelled), Blythe Bridge (13.0 km south-east, 75.5% on time, 2.4% cancelled) and Crewe (15.3 km west, 76.5% on time, 3.3% cancelled), which are the stations on its network closest to Longport.
Within 30 km of here, East Midlands Railway runs best at Alsager, 7.9 km north-west (78.5%), and worst at Longton, 7.9 km south-east (68.6%).
The busiest East Midlands Railway station within 30 km of Longport is Uttoxeter, 29.0 km south-east, with about 30 scheduled stops a day.
East Midlands Railway ranks 2nd of the 3 operators with enough records at Longport, on 67.2%.
Over three full railway years East Midlands Railway at Longport has improved each time, from 56.5% within three minutes in 2023-24 to 64.8% in 2024-25 and 67.1% in 2025-26.
Period by period
See how East Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 52 | – | – |
| Period 6 of 2026-27 | 52 | – | – |
| Period 5 of 2026-27 | 52 | – | – |
| Period 4 of 2026-27 | 46 | – | – |
| Period 3 of 2026-27 | 52 | – | – |
| Period 2 of 2026-27 | 52 | – | – |
| Period 1 of 2026-27 | 61 | 86.9% | 0.0% |
| Period 13 of 2025-26 | 56 | 90.4% | 7.1% |
| Period 12 of 2025-26 | 52 | – | – |
| Period 11 of 2025-26 | 48 | – | – |
| Period 10 of 2025-26 | 55 | – | – |
| Period 9 of 2025-26 | 84 | 49.4% | 3.6% |
| Period 8 of 2025-26 | 84 | 55.4% | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Longport
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 12,082 | 61.8% | 4.1% |
| Northern | 891 | 92.6% | 3.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out