Greater Anglia at London Liverpool Street
All trains at London Liverpool StreetGreater Anglia across BritainLondon
How this operator is doing here
Greater Anglia had 219,644 scheduled stops at London Liverpool Street in the 13 periods to Period 7 of 2026-27, 38% of the station's total. 89.7% of recorded arrivals came within three minutes and 1.8% of stops were cancelled.
Greater Anglia trains at London Liverpool Street also serve Bethnal Green (1.6 km north-east, – on time, – cancelled), Hackney Downs (3.7 km north-east, 89.2% on time, 2.4% cancelled), Stratford (London) (6.0 km north-east, 91.2% on time, 2.3% cancelled), Lea Bridge (6.2 km north-east, 97.5% on time, 3.9% cancelled), Seven Sisters (7.2 km north, 86.0% on time, 1.4% cancelled) and Tottenham Hale (7.9 km north, 90.3% on time, 3.2% cancelled), which are the stations on its network closest to London Liverpool Street.
Within 30 km of here, Greater Anglia runs best at Lea Bridge, 6.2 km north-east (97.5%), and worst at Cheshunt, 20.9 km north (85.4%).
The busiest Greater Anglia station within 30 km of London Liverpool Street is Stratford (London), 6.0 km north-east, with about 427 scheduled stops a day.
Greater Anglia at London Liverpool Street has slipped a little, from 92.9% within three minutes in the previous 13 periods to 89.7% in the latest 13, a fall of 3.2 percentage points. Cancellations held steady at 1.8% of scheduled stops, against 1.7% before.
Period by period
See how Greater Anglia Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 17,207 | 89.1% | 1.7% |
| Period 6 of 2026-27 | 17,079 | 84.1% | 1.6% |
| Period 5 of 2026-27 | 16,530 | 86.3% | 3.5% |
| Period 4 of 2026-27 | 17,571 | 88.4% | 2.2% |
| Period 3 of 2026-27 | 17,292 | 89.5% | 2.4% |
| Period 2 of 2026-27 | 16,685 | 92.9% | 0.7% |
| Period 1 of 2026-27 | 19,946 | 91.5% | 2.5% |
| Period 13 of 2025-26 | 16,337 | 91.0% | 1.8% |
| Period 12 of 2025-26 | 17,135 | 92.1% | 1.5% |
| Period 11 of 2025-26 | 16,715 | 92.1% | 1.0% |
| Period 10 of 2025-26 | 12,385 | 90.9% | 1.4% |
| Period 9 of 2025-26 | 17,341 | 88.9% | 1.1% |
| Period 8 of 2025-26 | 17,421 | 88.9% | 2.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at London Liverpool Street
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Elizabeth line | 234,014 | 92.5% | 2.7% |
| London Overground | 109,578 | 93.1% | 1.9% |
| c2c | 7,877 | 85.5% | 5.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out