Avanti at London Euston
How this operator is doing here
Avanti had 96,723 scheduled stops at London Euston in the 13 periods to Period 7 of 2026-27, 42% of the station's total. 58.3% of recorded arrivals came within three minutes and 5.8% of stops were cancelled.
Avanti trains at London Euston also serve Wembley Central (11.5 km west, – on time, – cancelled), Harrow and Wealdstone (15.6 km north-west, – on time, – cancelled), Watford Junction (23.5 km north-west, 53.5% on time, 6.0% cancelled), Tring (45.2 km north-west, – on time, – cancelled), Bletchley (66.4 km north-west, – on time, – cancelled) and Milton Keynes Central (71.4 km north-west, 49.6% on time, 4.8% cancelled), which are the stations on its network closest to London Euston.
The busiest Avanti station within 30 km of London Euston is Watford Junction, 23.5 km north-west, with about 45 scheduled stops a day.
Of the 5 operators with enough records at London Euston, Avanti is the least punctual, at 58.3%.
For Avanti, London Euston is the 17th best of 42 ranked stations. Its 58.3% here is 3.1 percentage points above the 55.2% across the whole network.
Over three full railway years Avanti at London Euston has got worse each time, from 64.9% within three minutes in 2023-24 to 61.8% in 2024-25 and 60.2% in 2025-26.
Period by period
See how Avanti Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 7,569 | 61.4% | 2.9% |
| Period 6 of 2026-27 | 7,811 | 53.5% | 2.9% |
| Period 5 of 2026-27 | 7,320 | 54.1% | 8.1% |
| Period 4 of 2026-27 | 7,543 | 46.8% | 11.5% |
| Period 3 of 2026-27 | 7,333 | 57.6% | 4.6% |
| Period 2 of 2026-27 | 7,480 | 57.1% | 7.0% |
| Period 1 of 2026-27 | 7,183 | 63.8% | 5.5% |
| Period 13 of 2025-26 | 8,705 | 69.8% | 3.2% |
| Period 12 of 2025-26 | 7,795 | 65.2% | 4.1% |
| Period 11 of 2025-26 | 7,320 | 62.8% | 7.4% |
| Period 10 of 2025-26 | 5,414 | 58.5% | 7.4% |
| Period 9 of 2025-26 | 7,801 | 49.2% | 7.6% |
| Period 8 of 2025-26 | 7,449 | 55.2% | 4.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at London Euston
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 81,869 | 74.2% | 5.0% |
| London Overground | 50,416 | 95.6% | 2.8% |
| Caledonian Sleeper | 1,230 | 77.4% | 2.4% |
| Lumo (West Coast) | 987 | 61.8% | 3.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out